WELL · 42-025-33689 · DISTRICT 2
Mabray #1
Bee County · Yougeen (5500) field · Vertical
Mabray #1 (API 42-025-33689) is a plugged well in Bee County, plugged January 2, 2018, last operated by Welder Exploration & Prod. Inc..
The RRC has issued 2 drilling permits (amended twice) between 2009 and 2010, permitted to 5,700 ft.
Operator of record
Welder Exploration & Prod. Inc.
- Based in
- San Antonio, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 9, 2023
- Permits on file
- 346
- Phone
- (210) 354-1515
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Welder Exploration & Prod. Inc. |
| Production reports | Welder Exploration & Prod., Inc.through Dec 2014 |
| Latest permit | Welder Exploration & Prod., Inc.Aug 25, 2010 |
- 5,700
- total depth, ft
- 4
- permits on file
- Aug 25, 2010
- last permit issued
- Mar 22, 2010
- completed
- 0
- cumulative oil, bbl
- 150K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Jan 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 22, 2010
- Shut in
- —
- Plugged
- Jan 2, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mabray G-2-257113 | Yougeen (Hockley 4500) | Welder Exploration & Prod., Inc. | 1 | 0 | 150K | Apr 2010 – Jan 2018 |
| Mabray G-2-255711 | Yougeen (5500) | Welder Exploration & Prod., Inc. | 1 | 0 | 0 | Mar 2010 – Apr 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Welder Exploration & Prod., Inc.Apr 2010 → Dec 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 700911-99 | Recompletion | Welder Exploration & Prod., Inc. | Aug 19, 2010 | Aug 25, 2010 | Dec 1, 2009 | 5,700 |
| 687476-97 | Drill | Welder Exploration & Prod., Inc. | May 6, 2010 | Nov 23, 2009 | Dec 11, 2009 | 5,700 |
| 687476-98 | Drill | Welder Exploration & Prod., Inc. | Jan 20, 2010 | Nov 23, 2009 | Dec 11, 2009 | 5,700 |
| 687476-99 | Drill | Welder Exploration & Prod., Inc. | Nov 17, 2009 | Nov 23, 2009 | Dec 11, 2009 | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-255711 | — | — | — | — |
| — | — G-2-257113 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,314 | 4,334 | Perforated |
| 5,265 | 5,282 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 712 | 12.25 | 270 S |
| 4.5 | 5,700 | 7.875 | 905 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 13, 2010 | Jun 3, 2010 | Yes |
| 00 | Sep 2, 2010 | — | — |
| 00 | Jul 2, 2010 | Mar 29, 2010 | Yes |
| 00 | May 14, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-33689 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-33689 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02533689, documented in the API reference.