WELL · 42-025-33873 · DISTRICT 2
Orr #1
Bee County · Sliva (Stillwell) field · Vertical
Orr #1 (API 42-025-33873) is a well in Bee County operated by Welder Exploration & Prod. Inc., completed August 15, 2013.
The RRC has issued 2 drilling permits (amended twice) between 2013 and 2014, permitted to 5,500 ft.
Completion filings report 3 formation tops, including Catahoula, Vicksburg, Stillwell.
No lease production has been reported under this well’s leases.
Operator of record
Welder Exploration & Prod. Inc.
- Based in
- San Antonio, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 9, 2023
- Permits on file
- 346
- Phone
- (210) 354-1515
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Welder Exploration & Prod. Inc. |
| Production reports | Welder Exploration & Prod., Inc.through Dec 2018 |
| Latest permit | Welder Exploration & Prod., Inc.Mar 22, 2014 |
- 5,500
- total depth, ft
- 4
- permits on file
- Mar 22, 2014
- last permit issued
- Aug 15, 2013
- completed
- 0
- cumulative oil, bbl
- 148K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 15, 2013
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Orr G-2-272901 | Sliva (2100) | Welderxp Ltd. | 1 | 0 | 146K | Feb 2014 – Jul 2026 |
| Orr G-2-270489 | Sliva (Stillwell) | Welder Exploration & Prod., Inc. | 1 | 0 | 1.22K | Aug 2013 – Mar 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Welder Exploration & Prod., Inc.Jan 2014 → Dec 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 779963-99 | Recompletion | Welder Exploration & Prod., Inc. | Feb 17, 2014 | Mar 22, 2014 | Feb 10, 2014 | 5,310 |
| 762043-97 | Drill | Welder Exploration & Prod., Inc. | Aug 26, 2013 | May 10, 2013 | Jul 5, 2013 | 5,500 |
| 762043-98 | Drill | Welder Exploration & Prod., Inc. | May 20, 2013 | May 10, 2013 | — | 5,500 |
| 762043-99 | Drill | Welder Exploration & Prod., Inc. | May 3, 2013 | May 10, 2013 | Jul 6, 2013 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-270489 | — | — | — | — |
| — | — G-2-272901 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 229 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,064 | 2,084 | Perforated |
| 4,380 | 4,381 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,143 | 12.25 | 470 S |
| 4.5 | 5,290 | 7.875 | 985 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 7, 2014 | Mar 27, 2014 | — |
| 00 | Oct 31, 2013 | Sep 5, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-33873 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-33873 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02533873, documented in the API reference.