TEXAS · WELLS · BORDEN COUNTY · API 42-033-00081 · DISTRICT 7B

Miller Morris #1

Plugged

Borden County · Wildcat field  · Vertical

Miller Morris #1 (API 42-033-00081) is a plugged well in Borden County, plugged July 15, 1992, last operated by Ashman & Hillard #3.

The RRC has issued one drilling permit, issued April 2, 1984, permitted to 8,600 ft.

It was permitted by Mitchell Energy Corporation and has since transferred to Ashman & Hillard #3 on the wellbore schedule.

Operator of record

Ashman & Hillard #3

Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMitchell Energy CorporationApr 2, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,600
total depth, ft
1
permits on file
Apr 2, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 15, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
234165-99OtherMitchell Energy CorporationMar 30, 1984Apr 2, 1984—8,600

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088756W-14 DisposalCanceled Jul 9, 19861,5001,2002,498–3,900

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03300081, documented in the API reference.