WELL · 42-033-00451 · DISTRICT 8

Conrad C #1

N

Borden County · Von Roeder field  · Vertical

Conrad C #1 (API 42-033-00451) is a well in Borden County operated by P.O.&G. Operating LLC, completed June 27, 1991.

The RRC has issued one drilling permit (amended once), issued December 28, 2004, permitted to 6,700 ft.

It was permitted by Buchanan, Billy R. and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Canyon.

Its 3 leases have reported 76.9K barrels of oil and 216K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

P.o.&g. Operating LLC

Permitted by Buchanan, Billy R.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Aug 4, 2025 · 95 permits on file · (713) 244-0779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleP.o.&g. Operating LLC
Production reportsBuchanan, Billy R.through Aug 2025
Latest permitBuchanan, Billy R.Dec 28, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
2
permits on file
Dec 28, 2004
last permit issued
Jun 27, 1991
completed
76.9K
cumulative oil, bbl
216K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 27, 1991
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Conrad "C" O-11-7144Von RoederP.o.&g. Operating, LLC411K17.7KJan 1993 – Jul 2026
Conrad "C1" O-11-68860Von Roeder (Clear Fork)Buchanan, Billy R.12.3K0Aug 2005 – Jul 2026
Conrad "C" O-11-67545Von RoederBuchanan, Billy R.163.5K199KMar 1996 – Jan 2006

Oil, barrels lease total

Last 12 months 22 · prior 12 85(-74%)

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maynard Oil Co.Jan 1993 → Oct 1994
  2. 2Buchanan, Billy R.Sep 1996 → Aug 2025
  3. 3Rasmussen, Hal J. Operating, IncOct 1997 → Oct 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
554144-98RecompletionBuchanan, Billy R.Jan 13, 2006Dec 28, 2004Jul 7, 20056,700
554144-99RecompletionBuchanan, Billy R.Nov 29, 2004Dec 28, 2004—6,520

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-7144————
—— O-11-67545————
—— O-11-68860————

Formation tops

As filed on W-2/G-1. Subsea from 2,302 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON REEF6,720-4,418

Perforations

Perforated and open-hole intervals.

FromToType
4,3284,462Perforated
6,6206,772Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37543017.5350 S
13.375430——
7.6252,450112,207 S
5.56,7206.751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 18, 2006Nov 7, 2005Yes
00Jan 26, 2006——
00Apr 10, 1996Aug 19, 1991—
00Sep 9, 1991Aug 19, 1991—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03300451, documented in the API reference.