WELL · 42-033-31768 · DISTRICT 8
South Lake Thomas 69 #1
Borden County · Suerte (Wolfcamp) field · Vertical
South Lake Thomas 69 #1 (API 42-033-31768) is a plugged well in Borden County, plugged January 11, 2006, last operated by Sharp Image Energy Inc..
The RRC has issued one drilling permit (amended once), issued January 11, 2001, permitted to 7,500 ft.
Completion filings report one formation top, including Wolfcamp.
Its lease has reported 43.3K barrels of oil and 24.4K mcf of gas since March 2001, last reporting in February 2006.
Operator of record
- Based in
- Big Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 16, 2026
- Permits on file
- 665
- Phone
- (432) 267-3126
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sharp Image Energy Inc. |
| Production reports | Sharp Image Energy, Inc.through Jan 2005 |
| Latest permit | Sharp Image Energy, Inc.Jan 11, 2001 |
- 7,500
- total depth, ft
- 2
- permits on file
- Jan 11, 2001
- last permit issued
- Feb 13, 2001
- completed
- 43.3K
- cumulative oil, bbl
- 24.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Feb 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 13, 2001
- Shut in
- —
- Plugged
- Jan 11, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| South Lake Thomas 69 O-11-68335 | Suerte (Wolfcamp) | Sharp Image Energy, Inc. | 1 | 43.3K | 24.4K | Mar 2001 – Feb 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sharp Image Energy, Inc.Mar 2001 → Jan 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 503967-97 | Drill | Sharp Image Energy, Inc. | Jul 27, 2001 | Jan 11, 2001 | — | 7,500 |
| 503967-99 | Drill | Sharp Image Energy, Inc. | Jan 11, 2001 | Jan 11, 2001 | Jan 15, 2001 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-68335 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,296 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WolfcampBASE OF WOLFCAMP | 5,300 | -3,004 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,114 | 6,116 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,949 | 11 | 740 S |
| 5.5 | 7,308 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 21, 2001 | Mar 22, 2001 | Yes |
| 00 | Aug 30, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-033-31768 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-033-31768 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000095264 | H-1 Injection | Plugged Jan 30, 2006 | 1,000 | 3,055 | 6,114–6,170 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03331768, documented in the API reference.