WELL · 42-037-30335 · DISTRICT 6

Chapin #1

Plugged

Bowie County · Wildcat field  · Vertical

Chapin #1 (API 42-037-30335) is a plugged well in Bowie County, plugged June 26, 2002, last operated by Sklar Exploration Company LLC.

The RRC has issued one drilling permit, issued May 30, 2002, permitted to 6,100 ft.

It was permitted by Sklar Exploration Company LLC and has since transferred to Sklar Exploration Company LLC on the wellbore schedule.

Operator of record

Sklar Exploration Company LLC

Permitted by Sklar Exploration Company LLC; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

6,100
total depth, ft
1
permits on file
May 30, 2002
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 26, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
520385-99DrillSklar Exploration Company LLCMay 28, 2002May 30, 2002Jun 12, 20026,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03730335, documented in the API reference.