WELL · 42-039-00083 · DISTRICT 3

Halligan O. M. #1

Plugged

Brazoria County · Manvel (Miocene 3900) field  · Vertical

Halligan O. M. #1 (API 42-039-00083) is a plugged well in Brazoria County, plugged September 10, 2014, last operated by North Central Oil Corp..

The RRC has issued one drilling permit (amended once), issued December 17, 1987, permitted to 4,014 ft.

It was permitted by Texaco Inc. and has since transferred to North Central Oil Corp. on the wellbore schedule.

Its 2 leases have reported 66.6K barrels of oil and 64.5K mcf of gas since January 1993, last reporting in September 2015. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

North Central Oil Corp.

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 13, 2005
Permits on file
558
Phone
(713) 297-5752

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorth Central Oil Corp.
Production reportsArgent Energy (US) Holdings Inc.through Sep 2013
Latest permitTexaco Inc.Dec 17, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,014
total depth, ft
2
permits on file
Dec 17, 1987
last permit issued
Feb 3, 1988
completed
66.6K
cumulative oil, bbl
64.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 3, 1988
Shut in
—
Plugged
Sep 10, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Halligan, O. M. O-3-23364Manvel (Miocene 3900)Denbury Onshore, LLC166.6K8.68KSep 1997 – Sep 2015
Halligan, O. M. G-3-126820Manvel (Miocene 3900)North Central Oil Corp.1055.8KJan 1993 – Jan 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Nov 1994
  2. 2North Central Oil Corp.Dec 1994 → Dec 2005
  3. 3Pogo Producing CompanyJan 2006 → Mar 2007
  4. 4Texcal Energy (GP) LLCApr 2007 → Apr 2010
  5. 5Energyquest II, LLCMay 2010 → Sep 2012
  6. 6Argent Energy (US) Holdings Inc.Oct 2012 → Sep 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
339060-98RecompletionTexaco Inc.Feb 24, 1988Dec 17, 1987—4,014
339060-99RecompletionTexaco Inc.Nov 19, 1987Dec 17, 1987—4,014

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-126820————
—— O-3-23364————

Perforations

Perforated and open-hole intervals.

FromToType
3,7003,706Perforated
3,9043,909Perforated
—4,200Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,12814300 S
73,9979.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 18, 1998Jan 21, 1997—
00Jan 16, 1998Dec 17, 1997—
00Jan 5, 1998——
00Oct 15, 1997Sep 12, 1997—
00Apr 19, 1988Feb 29, 1988Yes
00Apr 8, 1988——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03900083, documented in the API reference.