TEXAS · WELLS · BRAZORIA COUNTY · WEST HASTING UNIT LEASE · API 42-039-00398 · DISTRICT 03
West Hasting Unit #2
Brazoria County · Hastings West field · Injection · Vertical
West Hasting Unit #2 (API 42-039-00398) is a well in Brazoria County operated by Denbury Onshore LLC, completed March 25, 2026 and listed as injection on the RRC schedule, shut in November 1, 2024.
The RRC has issued one drilling permit, issued September 21, 1984, permitted to 6,127 ft.
It was permitted by Amoco Production Company and has since transferred to Denbury Onshore LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Miocene (undifferentiated), M5, M11, Anahuac.
Its lease has reported 45M barrels of oil and 14.1M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 566 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Permitted by Amoco Production Company; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 30, 2025
- Permits on file
- 789
- Phone
- (866) 831-3235
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Denbury Onshore LLC |
| Production reports | Denbury Onshore, LLCthrough Apr 2026 |
| Latest permit | Amoco Production CompanySep 21, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,127
- total depth, ft
- 1
- permits on file
- Sep 21, 1984
- last permit issued
- Mar 25, 2026
- completed
- 45M
- cumulative oil, bbl
- 14.1M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 25, 2026
- Shut in
- Nov 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 566 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Hasting Unit O-3-19054 | Hastings, West | Denbury Onshore, LLC | 566 | 45M | 14.1M | Jan 1993 – Apr 2026 |
Oil, barrels lease total
Last 12 months 1,488,833 · prior 12 1,670,563(-11%)
Gas, mcf lease total
Last 12 months 92,298 · prior 12 62,255(+48%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MW Petroleum CorporationJan 1993 → Mar 1998
- 2Tri-Union Development Corp.Apr 1998 → Oct 2004
- 3Texcal Energy (GP) LLCNov 2004 → Jan 2009
- 4Denbury Onshore, LLCFeb 2009 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 252564-99 | Recompletion | Amoco Production Company | Sep 21, 1984 | Sep 21, 1984 | — | 6,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 25, 2026 | West Hasting Unit O-3-19054 | Hastings West | Denbury Onshore LLC | Injection · shut in Nov 1, 2024 | 6,127 |
| Jan 23, 1985 | Avitts W. H. -B- O-3-5654 | Hastings West | Amoco Production Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 55 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 2,100 | -2,045 |
| M5 | 3,205 | -3,150 |
| M11 | 4,492 | -4,437 |
| Anahuac | 5,219 | -5,164 |
| Frio | 5,620 | -5,565 |
| Frio | 5,751 | -5,696 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,656 | 5,673 | Perforated |
| 5,656 | 5,676 | Perforated |
| 5,816 | 5,828 | Perforated |
| 5,896 | 5,996 | Perforated |
| 5,941 | 5,946 | Perforated |
| 5,945 | 5,955 | Perforated |
| 5,954 | 5,960 | Perforated |
| 5,975 | 5,995 | Perforated |
| 6,020 | 6,033 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 103 | 24 | 100 S |
| 10.75 | 1,844 | 14.5 | 600 S |
| 7 | 5,648 | 9.5 | 300 S |
| 7 | 5,648 | 9.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 3, 2026 | Apr 17, 2026 | — |
| 00 | Jul 13, 2026 | May 26, 2026 | — |
| 00 | Feb 27, 2026 | Jan 15, 2026 | — |
| 00 | Feb 22, 2024 | Jan 5, 2024 | — |
| 00 | Mar 6, 2023 | Jan 24, 2023 | — |
| 00 | Jun 30, 2020 | May 12, 2020 | — |
| 00 | Dec 2, 2016 | Nov 3, 2016 | — |
| 00 | Mar 30, 2016 | Apr 22, 2015 | — |
| 00 | Aug 30, 2011 | Jan 13, 2011 | — |
| 00 | Apr 14, 2010 | Nov 16, 2009 | — |
| 00 | Mar 20, 1986 | Feb 4, 1985 | — |
| 00 | Feb 25, 1986 | — | — |
| 00 | Feb 21, 1985 | Feb 4, 1985 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-00398 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-00398 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000127645 | H-1 Injection | Active | 30,000 | 2,810 | 5,620–6,030 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03900398, documented in the API reference.