TEXAS · WELLS · BRAZORIA COUNTY · API 42-039-05002 · DISTRICT 03
Paul Steve Unit #30
Brazoria County · Hastings (M- 3) field · Vertical
Paul Steve Unit #30 (API 42-039-05002) is a plugged well in Brazoria County, plugged September 12, 1997, last operated by MW Petroleum Corporation.
The RRC has issued 2 drilling permits between 1984 and 1993, permitted to 5,265 ft.
Completion filings report 6 formation tops, including M-7, M-8, M-8a, M-9.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 6, 1998
- Permits on file
- 364
- Phone
- (713) 296-6000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Amoco Production Company |
| Production reports | MW Petroleum Corporationthrough Jun 1994 |
| Latest permit | MW Petroleum CorporationSep 28, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,265
- total depth, ft
- 2
- permits on file
- Sep 28, 1993
- last permit issued
- Sep 23, 1993
- completed
- 0
- cumulative oil, bbl
- 46.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 23, 1993
- Shut in
- —
- Plugged
- Sep 12, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Paul, Steve Unit G-3-147023 | Hastings (M- 3) | MW Petroleum Corporation | 1 | 0 | 37.6K | Sep 1993 – Sep 1997 |
| Steve, Paul Unit G-3-114935 | Hastings (M-5A) | MW Petroleum Corporation | 1 | 0 | 8.73K | Jan 1993 – Sep 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MW Petroleum CorporationJan 1993 → Jun 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416525-99 | Recompletion | MW Petroleum Corporation | Sep 28, 1993 | Sep 28, 1993 | Sep 21, 1993 | 3,300 |
| 255855-99 | Recompletion | Amoco Production Company | Oct 17, 1984 | Oct 24, 1984 | — | 5,265 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 23, 1993 | Paul Steve Unit G-3-147023 | Hastings (M- 3) | MW Petroleum Corporation | Plugged | — |
| Nov 21, 1984 | Steve Paul Unit G-3-114935 | Hastings (M-5A) | MW Petroleum Corporation | Plugged | — |
| Nov 1, 1969 | Paul Steve Unit G-3-47322 | Hastings (M- 8) | Pan American Petroleum Corp. | Plugged | — |
| Feb 1, 1969 | Paul Steve Unit G-3-46001 | Hastings (M- 8A) | Pan American Petroleum Corp. | Plugged | — |
| Jun 1, 1968 | Paul Steve Unit G-3-44326 | Hastings (M- 9) | Pan American Petroleum Corp. | Plugged | — |
| Dec 1, 1967 | Paul Steve Unit G-3-43202 | Hastings (M-10) | Pan American Petroleum Corp. | Plugged | — |
| Jun 1, 1967 | Paul Steve Unit G-3-42140 | Hastings (M-10-A) | Pan American Petroleum Corp. | Plugged | — |
| — | Paul Steve Unit O-3-5697 | Hastings West | Amoco Production Company | Plugged | — |
| — | Paul Steve Unit G-3-48927 | Hastings (M- 7) | Amoco Production Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 41 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| M-7 | 3,538 | -3,497 |
| M-8 | 3,598 | -3,557 |
| M-8A | 3,654 | -3,613 |
| M-9 | 3,733 | -3,692 |
| M-10 | 3,851 | -3,810 |
| M-10A | 4,056 | -4,015 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,818 | 2,824 | Perforated |
| 3,358 | 3,368 | Perforated |
| 3,402 | 3,412 | Perforated |
| 4,056 | 4,062 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,234 | 11 | 380 S |
| 8.625 | 1,235 | — | — |
| 5.5 | 4,255 | 7.625 | 525 S |
| 5.5 | 4,255 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 21, 1993 | Oct 21, 1993 | Yes |
| 00 | Nov 4, 1993 | — | — |
| 00 | May 16, 1990 | May 2, 1990 | — |
| 00 | Mar 6, 1985 | Dec 12, 1984 | — |
| 00 | Feb 28, 1985 | Nov 21, 1985 | — |
| 00 | Jan 12, 1984 | Nov 19, 1969 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-05002 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-05002 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.