TEXAS · WELLS · BRAZORIA COUNTY · PLEDGER GFU LEASE · API 42-039-31202 · DISTRICT 03

Pledger Gfu #49

Shut in

Brazoria County · Pledger (Frio 6500-6800) field · Temp Abandoned  · Vertical

Pledger Gfu #49 (API 42-039-31202) is a well in Brazoria County operated by Texas Petroleum Investment CO., completed July 19, 1989 and listed as temp abandoned on the RRC schedule, shut in April 1, 2001.

The RRC has issued 5 drilling permits between 1977 and 1989, permitted to 8,200 ft.

It was permitted by Exxon Corp. and has since transferred to Texas Petroleum Investment CO. on the wellbore schedule.

Completion filings report 2 formation tops, including Marginulina, Frio.

No lease production has been reported under this well’s leases.

Operator of record

Texas Petroleum Investment Co.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
233
Phone
(713) 789-9225

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsAroc (Texas) Inc.through Mar 2001
Latest permitExxon Corp.Jun 13, 1989
8,200
total depth, ft
5
permits on file
Jun 13, 1989
last permit issued
Jul 19, 1989
completed
0
cumulative oil, bbl
518K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 19, 1989
Shut in
Apr 1, 2001
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pledger Gfu G-3-131637Pledger (Frio 6500-6800)Texas Petroleum Investment Co.10518KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Sep 1994
  2. 2Bargo Energy CompanyMay 1997 → Apr 2000
  3. 3Aroc (Texas) Inc.May 2000 → Mar 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
360357-99RecompletionExxon Corp.Jun 13, 1989Jun 13, 1989—8,200
250106-99RecompletionExxon Corp.Aug 1, 1984Aug 31, 1984—8,200
174842-99RecompletionExxon Corp.Oct 7, 1982Oct 7, 1982—8,200
83623-99RecompletionExxon Corp.Apr 29, 1980Apr 29, 1980—8,200
12678-99DrillExxon Corp.Nov 23, 1977Nov 23, 1977Dec 18, 19778,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 19, 1989Pledger Gfu G-3-131637Pledger (Frio 6500-6800)Texas Petroleum Investment Co.Temp Abandoned · shut in Apr 1, 20018,200
Oct 16, 1984Pledger GU 3 G-3-75473Pledger (Braman 7800)Exxon Corp.Not on Schedule—
Oct 23, 1980Pledger GU 3 G-3-90552Pledger (Carter 7940)Exxon Corp.Not on Schedule—
—Pledger Gas Unit 3 G-3-75474Pledger (Betts 8000)Exxon Corp.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 57 ft elevation.Download CSV →

FormationMD ftSubsea
Marginulina6,740-6,683
Frio6,776-6,719

Perforations

Perforated and open-hole intervals.

FromToType
6,7366,746Perforated
7,6427,647Perforated
7,9427,952Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,53314.75750 S
2.3757,740——
2.3757,898——
78,1999.875520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 13, 1989Aug 25, 1989Yes
00Aug 31, 1989——
00Dec 13, 1984Dec 3, 1984—
00Jan 12, 1984Nov 20, 1980—
00Jan 12, 1984Mar 7, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03931202, documented in the API reference.