WELL · 42-039-31480 · DISTRICT 3

Brock #40

Y

Brazoria County · Stratton Ridge field · Shut IN  · Vertical

Brock #40 (API 42-039-31480) is a well in Brazoria County operated by Dow Infraco LLC, completed October 11, 1979 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued September 28, 1979, permitted to 4,000 ft.

It was permitted by Dow Chemical CO., The and has since transferred to Dow Infraco LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Sand And Clay, Sand And Shale, Sand And Lime, Coal Streak.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 2.71M barrels injected in the 12 months reported through January 1993.

Operator of record

Dow Infraco LLC

Permitted by Dow Chemical Co., The; the EWA schedule now lists a different operator.

Based in
Freeport, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Phone
(979) 238-5169

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDow Infraco LLC
Production reportsnone
Latest permitDow Chemical Co., TheSep 28, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Sep 28, 1979
last permit issued
Oct 11, 1979
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 11, 1979
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 65 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brock O-3-11376Stratton RidgeDow Infraco, LLC6500Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
59240-99DrillDow Chemical Co., TheSep 28, 1979Sep 28, 1979—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-11376————

Formation tops

As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →

FormationMD ftSubsea
Sand and Clay230
Sand and Shale293-270
Sand and Lime937-914
Coal Streak1,034-1,011
Hard Lime1,044-1,021
Lime and Caprock1,051-1,028
Salt1,347-1,324
Ground Level TO RKB——

Perforations

Perforated and open-hole intervals.

FromToType
—4,100Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
36286481,800 S
241,237322,400 S
201,948302,200 S
163,815——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 24, 2026Jun 16, 2026—
00Jan 12, 1984Feb 3, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.71M
bbl, last 12 reported months
29.8M
bbl, all reported
Jan 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000040915UIC PermitActive002,250–3,540

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,707,000 · prior 12 9,952,295(-73%)

0500K1M1.5M19921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03931480, documented in the API reference.