WELL · 42-039-31936 · DISTRICT 3
Dunnam V. #1
Brazoria County · Chenango East (10400 Frio) field · Vertical
Dunnam V. #1 (API 42-039-31936) is a plugged well in Brazoria County, plugged August 6, 2010, last operated by Huber J. M. Corporation.
The RRC has issued 2 drilling permits between 1983 and 1986, permitted to 12,000 ft.
Completion filings report 4 formation tops, including Dunnam - Frio, Dunnam-Frio, Burkhead - Frio, Burkhead-Frio.
Operator of record
- Based in
- Edison, NJ
- P-5 status
- Active (A)
- P-5 last filed
- Jun 3, 2026
- Permits on file
- 1,003
- Phone
- (732) 603-3630
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Huber J. M. Corporation |
| Production reports | Osu Tank Trucks, LLCthrough Feb 2006 |
| Latest permit | Huber, J. M., CorporationFeb 10, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 2
- permits on file
- Feb 10, 1986
- last permit issued
- Dec 28, 1983
- completed
- 0
- cumulative oil, bbl
- 374K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 28, 1983
- Shut in
- —
- Plugged
- Aug 6, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Vance Dunnam G-3-121022 | Chenango, E. (Dunnam) | Buffco Production Inc. | 1 | 0 | 374K | Jan 1993 – May 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Huber, J. M., CorporationJan 1993 → Nov 1996
- 2Marwell Petroleum, Inc.Dec 1996 → Nov 2004
- 3Osu Tank Trucks, LLCDec 2004 → Feb 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 297403-99 | Recompletion | Huber, J. M., Corporation | Feb 10, 1986 | Feb 10, 1986 | — | 12,000 |
| 217843-99 | Drill | Republic Mineral Corporation | Jan 26, 1984 | Oct 18, 1983 | — | 10,616 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-121022 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 37 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dunnam - Frio | 10,696 | -10,659 |
| Dunnam-Frio | 10,696 | -10,659 |
| Burkhead - Frio | 10,786 | -10,749 |
| Burkhead-Frio | 10,786 | -10,749 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,432 | 10,442 | Perforated |
| 10,696 | 10,716 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,040 | 13.5 | 1,135 S |
| 5.5 | 10,596 | 8.75 | 1,160 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1986 | May 6, 1986 | Yes |
| 00 | May 29, 1986 | May 6, 1986 | Yes |
| 00 | May 15, 1986 | — | — |
| 00 | Feb 14, 1984 | Jan 17, 1984 | — |
| 00 | Jan 31, 1984 | Jan 17, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-31936 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-31936 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03931936, documented in the API reference.