WELL · 42-039-31989 · DISTRICT 3
I. P. Farms #1
Brazoria County · Chenango East (10400 Frio) field · Vertical
I. P. Farms #1 (API 42-039-31989) is a plugged well in Brazoria County, plugged February 25, 1994, last operated by Huber J. M. Corporation.
The RRC has issued one drilling permit, issued May 29, 1984, permitted to 11,000 ft.
Completion filings report one formation top, including Frio.
Operator of record
- Based in
- Edison, NJ
- P-5 status
- Active (A)
- P-5 last filed
- Jun 3, 2026
- Permits on file
- 1,003
- Phone
- (732) 603-3630
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Huber J. M. Corporation |
| Production reports | none |
| Latest permit | Huber, J. M., CorporationMay 29, 1984 |
- 11,000
- total depth, ft
- 1
- permits on file
- May 29, 1984
- last permit issued
- Apr 18, 1988
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 18, 1988
- Shut in
- —
- Plugged
- Feb 25, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| I. P. Farms G-3-112726 | Chenango, East (10400 Frio) | Huber, J. M., Corporation | 1 | 0 | 0 | Jan 1993 – Feb 1994 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 240489-99 | Drill | Huber, J. M., Corporation | May 29, 1984 | May 29, 1984 | Jun 22, 1984 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-112726 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 36 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| FrioTOP FRIO | 8,285 | -8,249 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,620 | 3,650 | Perforated |
| 10,408 | 10,412 | Perforated |
| 10,414 | 10,418 | Perforated |
| 10,422 | 10,436 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,218 | 14.375 | 1,450 S |
| 5.5 | 10,530 | 9.875 | 1,175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 10, 1988 | May 17, 1988 | — |
| 00 | Oct 15, 1984 | Sep 27, 1984 | — |
| 00 | Oct 5, 1984 | Jul 29, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-31989 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-31989 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 1993
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000065714 | W-14 Disposal | Plugged Mar 10, 1994 | 500 | 800 | 3,350–4,350 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03931989, documented in the API reference.