TEXAS · WELLS · BRAZORIA COUNTY · API 42-039-32166 · DISTRICT 03
Grote Emil #22
Brazoria County · Hastings (M- 6) field · Not Eligible for Allowable · Directional
Grote Emil #22 (API 42-039-32166) is a well in Brazoria County operated by Denbury Onshore LLC, completed September 24, 2014 and listed as not eligible for allowable on the RRC schedule, shut in January 1, 1998.
The RRC has issued 4 drilling permits between 1986 and 1995, permitted to 6,738 ft.
It was permitted by MW Petroleum Corporation and has since transferred to Denbury Onshore LLC on the wellbore schedule.
Completion filings report 4 formation tops, including D-1 Sand, F-1 Sand, G-1 Sand, I-1 Sand.
Its 4 leases have reported 45M barrels of oil and 14.2M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 569 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by MW Petroleum Corporation; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 30, 2025
- Permits on file
- 789
- Phone
- (866) 831-3235
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Denbury Onshore LLC |
| Production reports | Denbury Onshore, LLCthrough Apr 2026 |
| Latest permit | MW Petroleum CorporationApr 27, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,738
- total depth, ft
- 4
- permits on file
- Apr 27, 1995
- last permit issued
- Sep 24, 2014
- completed
- 45M
- cumulative oil, bbl
- 14.2M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 24, 2014
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 569 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Hasting Unit O-3-19054 | Hastings, West | Denbury Onshore, LLC | 566 | 45M | 14.1M | Jan 1993 – Apr 2026 |
| Grote, Emil G-3-154726 | Hastings (M- 6) | Denbury Onshore, LLC | 1 | 0 | 15.2K | May 1995 – May 1996 |
| Grote, Emil G-3-153087 | Hastings (M- 9) | Denbury Onshore, LLC | 1 | 0 | 13.2K | Jan 1995 – Apr 1995 |
| Grote, Emil G-3-150652 | Hastings (M-10) | MW Petroleum Corporation | 1 | 0 | 10.3K | Jul 1994 – Dec 1994 |
Oil, barrels lease total
Last 12 months 1,488,833 · prior 12 1,670,563(-11%)
Gas, mcf lease total
Last 12 months 92,298 · prior 12 62,255(+48%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MW Petroleum CorporationJan 1993 → Mar 1998
- 2Tri-Union Development Corp.Apr 1998 → Oct 2004
- 3Texcal Energy (GP) LLCNov 2004 → Jan 2009
- 4Denbury Onshore, LLCFeb 2009 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 435282-99 | Recompletion | MW Petroleum Corporation | Apr 27, 1995 | Apr 27, 1995 | May 1, 1995 | 3,800 |
| 431850-99 | Recompletion | MW Petroleum Corporation | Jan 17, 1995 | Feb 10, 1995 | Jan 10, 1995 | 3,900 |
| 426122-99 | Recompletion | MW Petroleum Corporation | Jul 21, 1994 | Aug 16, 1994 | Jun 22, 1994 | 4,075 |
| 323295-99 | Drill | Amoco Production Company | Nov 19, 1986 | Nov 19, 1986 | — | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 24, 2014 | Grote Emil G-3-154726 | Hastings (M- 6) | Denbury Onshore LLC | Not Eligible for Allowable · shut in Jan 1, 1998 | 6,738 |
| Jan 12, 1995 | Grote Emil G-3-153087 | Hastings (M- 9) | Denbury Onshore LLC | Not on Schedule | — |
| Jul 15, 1994 | Grote Emil G-3-150652 | Hastings (M-10) | MW Petroleum Corporation | Not on Schedule | — |
| Jan 26, 1987 | West Hasting Unit O-3-19054 | Hastings West | Denbury Onshore LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 37 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| D-1 Sand | 5,310 | -5,273 |
| F-1 Sand | 5,476 | -5,439 |
| G-1 Sand | 5,642 | -5,605 |
| I-1 Sand | 5,984 | -5,947 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,565 | 3,570 | Perforated |
| 3,814 | 3,820 | Perforated |
| 3,959 | 3,965 | Perforated |
| 6,180 | 6,194 | Perforated |
| 6,394 | 6,416 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,228 | 14.75 | 2,300 S |
| 7 | 6,738 | 9.875 | 2,500 S |
| 7 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 30, 2015 | Jun 17, 2015 | — |
| 00 | Aug 21, 1995 | Jun 27, 1995 | Yes |
| 00 | Jul 27, 1995 | — | — |
| 00 | Mar 20, 1995 | Feb 14, 1995 | Yes |
| 00 | Mar 8, 1995 | — | — |
| 00 | Sep 28, 1994 | Aug 18, 1994 | Yes |
| 00 | Aug 31, 1994 | — | — |
| 00 | Mar 31, 1992 | Mar 20, 1991 | — |
| 00 | Jul 15, 1987 | Jun 22, 1987 | Yes |
| 00 | Jul 14, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-32166 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-32166 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03932166, documented in the API reference.