TEXAS · WELLS · BRAZOS COUNTY · API 42-041-31038 · DISTRICT 03

Rasco #1

Plugged

Brazos County  · Vertical

Rasco #1 (API 42-041-31038) is a plugged well in Brazos County, plugged October 11, 1984, last operated by L & B Oil CO. Inc..

The RRC has issued one drilling permit, issued October 27, 1983, permitted to 9,500 ft.

Operator of record

L & B Oil Co. Inc.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 23, 1986
Permits on file
120
Phone
(713) 988-8400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitL & B Oil Co. Inc.Oct 27, 1983
9,500
total depth, ft
1
permits on file
Oct 27, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 11, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
219074-99DrillL & B Oil Co. Inc.Oct 27, 1983Oct 27, 1983—9,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04131038, documented in the API reference.