TEXAS · WELLS · BRAZOS COUNTY · JONES-CASHION UNIT LEASE · API 42-041-31827 · DISTRICT 03

Jones-Cashion Unit #1

Plugged

Brazos County · Giddings (Austin Chalk-3) field  · Horizontal

Jones-Cashion Unit #1 (API 42-041-31827) is a plugged horizontal well in Brazos County, plugged January 14, 2013, last operated by Enervest Operating L.L.C..

The RRC has issued one drilling permit, issued July 21, 1994, permitted to 9,900 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Enervest Operating L.L.C. on the wellbore schedule.

Completion filings report 6 formation tops, including Midway, Navarro, Pecan Gap, Austin Chalk.

Its lease has reported 157K barrels of oil and 799K mcf of gas since December 1994, last reporting in August 2013.

Operator of record

Enervest Operating L.L.C.

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 13, 2026
Permits on file
1,249
Phone
(713) 659-3500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnervest Operating L.L.C.
Production reportsEnervest Operating, L.L.C.through Nov 2012
Latest permitUnion Pacific Resources CompanyJul 21, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
1
permits on file
Jul 21, 1994
last permit issued
Dec 1, 1994
completed
157K
cumulative oil, bbl
799K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Aug 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1994
Shut in
—
Plugged
Jan 14, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jones-Cashion Unit O-3-22632Giddings (Austin Chalk-3)Enervest Operating, L.L.C.1157K799KDec 1994 – Aug 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyDec 1994 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Jul 2007
  4. 4Enervest Operating, L.L.C.Oct 2007 → Jul 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
425903-99DrillUnion Pacific Resources CompanyJul 14, 1994Jul 21, 1994Sep 19, 19949,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 1, 1994Jones-Cashion Unit O-3-22632Giddings (Austin Chalk-3)Enervest Operating L.L.C.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →

FormationMD ftSubsea
Midway5,128-4,787
Navarro6,828-6,487
Pecan Gap7,821-7,480
Austin Chalk8,728-8,387
Buda9,529-9,188
Georgetown9,665-9,324

Perforations

Perforated and open-hole intervals.

FromToType
8,75212,951Perforated
8,8469,006Perforated
9,61313,520Perforated
9,66313,571Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,42014.751,506 S
7.625—9.8751,069 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 1995Jan 17, 1995Yes
00Feb 23, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04131827, documented in the API reference.