TEXAS · WELLS · BRAZOS COUNTY · TERRELL LEASE · API 42-041-31829 · DISTRICT 03

Terrell #1H

Y

Brazos County · Clay NE (Austin Chalk 11350) field · Producing  · Horizontal

Terrell #1H (API 42-041-31829) is a horizontal well in Brazos County operated by Redbud E & P Inc., completed September 24, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 1, 1994, permitted to 16,617 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Redbud E & P Inc. on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 5.03K barrels of oil and 2.12M mcf of gas since September 1994, last reporting volume in April 2026.

Operator of record

Redbud E & P Inc.

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Giddings, TX
P-5 status
Active (A)
P-5 last filed
Jun 9, 2026
Permits on file
14
Phone
(979) 542-3085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRedbud E & P Inc.
Production reportsRedbud E & P, Inc.through Apr 2026
Latest permitChesapeake Operating, Inc.Aug 1, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,617
total depth, ft
1
permits on file
Aug 1, 1994
last permit issued
Sep 24, 1994
completed
5.03K
cumulative oil, bbl
2.12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 24, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Terrell G-3-153348Clay, NE (Austin Chalk 11350)Redbud E & P, Inc.15.03K2.12MSep 1994 – Apr 2026

Gas, mcf lease total

Last 12 months 549 · prior 12 516(+6%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Sep 1994 → Jun 2009
  2. 2Enervest Operating, L.L.C.Jul 2009 → Apr 2016
  3. 3Crawford Hughes Operating Co.May 2016 → Jun 2019
  4. 4Ineos USA Oil & Gas LLCAug 2019 → May 2025
  5. 5Redbud E & P, Inc.Jun 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
426503-99DrillChesapeake Operating, Inc.Aug 1, 1994Aug 1, 1994Aug 8, 199413,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 24, 1994Terrell G-3-153348Clay NE (Austin Chalk 11350)Redbud E & P Inc.Producing16,617

Formation tops

As filed on W-2/G-1. Subsea from 195 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk12,270-12,075

Perforations

Perforated and open-hole intervals.

FromToType
12,35816,617Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
164024150 S
10.752,70614.751,235 S
7.62512,3589.8751,077 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 5, 1995Nov 9, 1994Yes
00Mar 27, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04131829, documented in the API reference.