TEXAS · WELLS · BRAZOS COUNTY · MOORE, H. H. UNIT LEASE · API 42-041-31970 · DISTRICT 03

Moore H. H. Unit #2

Y

Brazos County · Giddings (Austin Chalk-3) field · Producing  · Horizontal

Moore H. H. Unit #2 (API 42-041-31970) is a horizontal well in Brazos County operated by Magnolia Oil & Gas Operating LLC, completed December 1, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 25, 2004, permitted to 13,762 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Magnolia Oil & Gas Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Wilcox, Midway, Pecan Gap, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Magnolia Oil & Gas Operating LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 6, 2026
Permits on file
615
Phone
(713) 842-9050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnolia Oil & Gas Operating LLC
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitAnadarko E&P Company LPAug 25, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,762
total depth, ft
1
permits on file
Aug 25, 2004
last permit issued
Dec 1, 2004
completed
0
cumulative oil, bbl
1.46M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Moore, H. H. Unit G-3-208650Giddings (Austin Chalk, Gas)Magnolia Oil & Gas Operating LLC101.46MNov 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 29,182 · prior 12 29,732(-2%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPNov 2004 → Jul 2007
  2. 2Enervest Operating, L.L.C.Aug 2007 → Jul 2018
  3. 3Magnolia Oil & Gas Operating LLCAug 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
549933-99DrillAnadarko E&P Company LPAug 23, 2004Aug 25, 2004Sep 22, 200413,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 1, 2004Moore H. H. Unit G-3-208650Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLCProducing13,762

Formation tops

As filed on W-2/G-1. Subsea from 192 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox4,720-4,528
Midway8,524-8,332
Pecan Gap12,649-12,457
Austin Chalk13,130-12,938

Perforations

Perforated and open-hole intervals.

FromToType
13,19018,100Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,54214.751,410 S
7.62513,1809.875760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 22, 2005Apr 15, 2005Yes
00Jun 17, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04131970, documented in the API reference.