WELL · 42-047-01458 · DISTRICT 4
McGill Bros. NCT-1 #35
Brooks County · Encinitas (V-16) field · Vertical
Mcgill Bros. Nct-1 #35 (API 42-047-01458) is a plugged well in Brooks County, plugged July 4, 2010, last operated by Texaco Inc..
The RRC has issued 2 drilling permits between 1985 and 1997, permitted to 8,760 ft.
It was permitted by Texaco E & P Inc. and has since transferred to Texaco Inc. on the wellbore schedule.
Operator of record
Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 27, 1996
- Permits on file
- 4,906
- Phone
- (432) 688-4643
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texaco Inc. |
| Production reports | Texaco E & P Inc.through Jul 2001 |
| Latest permit | Texaco E & P Inc.Jan 31, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,760
- total depth, ft
- 2
- permits on file
- Jan 31, 1997
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 30.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jul 4, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McGill Bros. NCT-1 G-4-161982 | Encinitas (V-12) | Chevron U. S. A. Inc. | 1 | 0 | 30.1K | Jan 1997 – Jul 2010 |
| McGill Bros. NCT-1 G-4-115347 | Encinitas (V-14) | Texaco E & P Inc. | 1 | 0 | 325 | Jan 1993 – Jan 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Mar 1996 → Jul 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 458087-99 | Recompletion | Texaco E & P Inc. | Jan 31, 1997 | Jan 31, 1997 | Jan 15, 1997 | 8,760 |
| 264304-99 | Recompletion | Texaco Inc. | Jan 10, 1985 | Jan 16, 1985 | — | 8,760 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-115347 | — | — | — | — |
| — | — G-4-161982 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,182 | 8,201 | Perforated |
| 8,372 | 8,382 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,008 | 15 | 392 S |
| 10.75 | 1,008 | — | — |
| 7 | 8,102 | 9.875 | 1,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 1, 1997 | Feb 11, 1997 | Yes |
| 00 | Mar 13, 1997 | — | — |
| 00 | Apr 1, 1985 | Feb 26, 1985 | — |
| 00 | Mar 29, 1985 | Feb 26, 1985 | — |
| 00 | Mar 16, 1985 | Feb 13, 1985 | — |
| 00 | Jan 12, 1984 | Aug 4, 1961 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-01458 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-01458 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04701458, documented in the API reference.