WELL · 42-047-30223 · DISTRICT 4
McGill Bros. NCT-1 #64
Brooks County · Kelsey Deep (Zone 21-B) field · Vertical
Mcgill Bros. Nct-1 #64 (API 42-047-30223) is a plugged well in Brooks County, plugged July 30, 2006, last operated by Texaco Inc..
The RRC has issued 3 drilling permits between 1979 and 1992, permitted to 7,300 ft.
It was permitted by Texaco E & P Inc. and has since transferred to Texaco Inc. on the wellbore schedule.
Its 3 leases have reported 40.1K barrels of oil and 20.4K mcf of gas since January 1993, last reporting in September 2006. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 27, 1996
- Permits on file
- 4,906
- Phone
- (432) 688-4643
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texaco Inc. |
| Production reports | Texaco E & P Inc.through Sep 1997 |
| Latest permit | Texaco E & P Inc.Aug 14, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,300
- total depth, ft
- 3
- permits on file
- Aug 14, 1992
- last permit issued
- Jan 25, 1980
- completed
- 40.1K
- cumulative oil, bbl
- 20.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 25, 1980
- Shut in
- —
- Plugged
- Jul 30, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McGill Bros. NCT-1 'C' O-4-12892 | Kelsey (Frio Consol.) | Chevron U. S. A. Inc. | 1 | 0 | 0 | Feb 2000 – Sep 2006 |
| McGill Bros. NCT-1 O-4-1350 | Kelsey, Deep (Zone 18-B) | Texaco E & P Inc. | 4 | 151 | 209 | Jan 1993 – Feb 2000 |
| McGill Bros. NCT-1 O-4-9480 | Kelsey, Deep (Zone 19-a, NE) | Texaco E & P Inc. | 3 | 40K | 20.2K | Jan 1993 – Feb 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Sep 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 401564-99 | Recompletion | Texaco E & P Inc. | Jul 23, 1992 | Aug 14, 1992 | Jul 26, 1992 | 7,300 |
| 72120-99 | Recompletion | Texaco Inc. | Feb 8, 1980 | Feb 8, 1980 | — | 7,300 |
| 67842-99 | Recompletion | Texaco Inc. | Dec 28, 1979 | Dec 28, 1979 | — | 7,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-1350 | — | — | — | — |
| — | — O-4-9480 | — | — | — | — |
| — | — O-4-12892 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,986 | 5,998 | Perforated |
| 6,029 | 6,036 | Perforated |
| 6,064 | 6,072 | Perforated |
| 6,360 | 6,370 | Perforated |
| 6,559 | 6,565 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,600 | 13.5 | 750 S |
| 2.375 | 6,046 | — | — |
| 2.375 | 6,253 | — | — |
| 4.5 | 7,300 | 8.75 | 595 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 4, 2000 | Sep 30, 1992 | Yes |
| 00 | Nov 16, 1992 | Sep 30, 1992 | Yes |
| 00 | Oct 7, 1992 | Dec 23, 1986 | — |
| 00 | Jan 5, 1987 | Dec 23, 1986 | — |
| 00 | Jan 12, 1984 | Sep 11, 1980 | — |
| 00 | Jan 12, 1984 | Apr 15, 1976 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-30223 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-30223 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04730223, documented in the API reference.