TEXAS · WELLS · BROOKS COUNTY · API 42-047-30329 · DISTRICT 04

Mariposa Field Gas Unit #C 12

Shut in

Brooks County · Mariposa (C11-N6 Cons. Gas) field · Temp Abandoned  · Vertical

Mariposa Field Gas Unit #C 12 (API 42-047-30329) is a well in Brooks County operated by Merit Energy Company, completed October 16, 1996 and listed as temp abandoned on the RRC schedule, shut in March 1, 2001.

The RRC has issued 2 drilling permits between 1991 and 1996, permitted to 10,100 ft.

It was permitted by Exxon Corp. and has since transferred to Merit Energy Company on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Merit Energy Company

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsExxon Mobil Corporationthrough Feb 2001
Latest permitExxon Corp.Sep 13, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,100
total depth, ft
2
permits on file
Sep 13, 1996
last permit issued
Oct 16, 1996
completed
0
cumulative oil, bbl
139K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 16, 1996
Shut in
Mar 1, 2001
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mariposa Field Gas Unit G-4-160698Mariposa (N-6)Merit Energy Company10139KOct 1996 – Jul 2026
Mariposa Field Gas Unit G-4-139591Mariposa (O-2)Exxon Corp.100Jan 1993 – Oct 1996
Mariposa Field Gas Unit O-4-9338WildcatExxon Corp.200Jan 1993 – Nov 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Nov 1996 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Feb 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
452606-99RecompletionExxon Corp.Sep 13, 1996Sep 13, 1996Oct 15, 19968,982
390674-99RecompletionExxon Corp.Aug 7, 1991Aug 13, 1991Sep 2, 199110,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 16, 1996Mariposa Field Gas Unit G-4-160698Mariposa (C11-N6 Cons. Gas)Merit Energy CompanyTemp Abandoned · shut in Mar 1, 200110,100
Oct 11, 1991Mariposa Field Gas Unit G-4-139591Mariposa (O-2)Exxon Corp.Not on Schedule—
Apr 21, 1977Mariposa Field Gas Unit O-4-9338WildcatExxon Corp.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
8,9248,932Perforated
9,0469,052Perforated
9,7719,790Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,03312.25850 S
5.59,7487.875830 S
2.87510,0804.625270 S
8.62520,33312.25850 S
5.597,4807.875830 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 1, 1997Nov 21, 1996Yes
00Dec 5, 1996——
00Nov 20, 1991Oct 22, 1991Yes
00Oct 28, 1991——
00Jan 12, 1984Aug 24, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04730329, documented in the API reference.