WELL · 42-047-30885 · DISTRICT 4
Lips Barbara B (Ecr) #2
Brooks County · Lopez Ranch (Vksbg 12250) field · Vertical
Lips Barbara B (Ecr) #2 (API 42-047-30885) is a plugged well in Brooks County, plugged March 14, 2001, last operated by Bass Enterprises Production CO..
The RRC has issued 2 drilling permits between 1980 and 1992, permitted to 14,000 ft.
It was permitted by Shell Western E&P Inc. and has since transferred to Bass Enterprises Production CO. on the wellbore schedule.
Operator of record
Bass Enterprises Production Co.
Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 25, 2006
- Permits on file
- 801
- Phone
- (817) 390-8400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bass Enterprises Production Co. |
| Production reports | Bass Enterprises Production Co.through Mar 2000 |
| Latest permit | Shell Western E&P Inc.Jul 15, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 2
- permits on file
- Jul 15, 1992
- last permit issued
- Aug 12, 1995
- completed
- 0
- cumulative oil, bbl
- 23.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 12, 1995
- Shut in
- —
- Plugged
- Mar 14, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lips, Barbara "B" (Ecr) G-4-94697 | Lopez Ranch (Vksbg 12250) | Bass Enterprises Production Co. | 1 | 0 | 23.8K | Jan 1993 – Mar 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&P Inc.Jan 1993 → Apr 1995
- 2Bass Enterprises Production Co.Mar 2000 → Mar 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 401240-99 | Recompletion | Shell Western E&P Inc. | Jul 15, 1992 | Jul 15, 1992 | Jul 12, 1992 | 13,855 |
| 95222-99 | Drill | Hilliard Oil & Gas, Inc. | Oct 8, 1980 | Oct 8, 1980 | Oct 10, 1980 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-94697 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,748 | 9,838 | Perforated |
| 12,396 | 12,444 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,645 | 17.5 | 1,490 S |
| 9.625 | 8,948 | 12.25 | 1,590 S |
| 2.5 | 12,200 | — | — |
| 5 | 13,847 | 8.5 | 2,550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 10, 1995 | Feb 18, 1993 | Yes |
| 00 | Jan 12, 1984 | Jun 15, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-30885 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-30885 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04730885, documented in the API reference.