TEXAS · WELLS · BROOKS COUNTY · MCGILL BROS LEASE · API 42-047-30917 · DISTRICT 04
McGill Bros #466
Brooks County · Kelsey Deep (Zone 23) field · Vertical
Mcgill Bros #466 (API 42-047-30917) is a plugged well in Brooks County, plugged August 28, 1995, last operated by Exxon Corp..
The RRC has issued 4 drilling permits between 1980 and 1985, permitted to 7,800 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Oct 25, 1985 |
- 7,800
- total depth, ft
- 4
- permits on file
- Oct 25, 1985
- last permit issued
- Dec 11, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 11, 1985
- Shut in
- —
- Plugged
- Aug 28, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McGill Bros O-4-10452 | Kelsey, Deep (Zone 23) | Exxon Corp. | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 288604-99 | Recompletion | Exxon Corp. | Oct 24, 1985 | Oct 25, 1985 | — | 7,400 |
| 202699-99 | Recompletion | Exxon Corp. | Jul 25, 1983 | Jul 25, 1983 | — | 7,400 |
| 192100-99 | Recompletion | Exxon Corp. | Apr 20, 1983 | Apr 20, 1983 | — | 7,400 |
| 104643-99 | Drill | Exxon Corp. | Dec 31, 1980 | Dec 31, 1980 | Jan 15, 1981 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 11, 1985 | McGill Bros O-4-10452 | Kelsey Deep (Zone 23) | Exxon Corp. | Plugged | — |
| Dec 11, 1985 | McGill Bros O-4-10452 | Kelsey Deep (Zone 23) | Exxon Corp. | Plugged | — |
| Mar 17, 1981 | McGill Bros. G-4-94617 | Kelsey Deep (Zone 25-II Lower) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,481 | 6,484 | Perforated |
| 6,586 | 6,596 | Perforated |
| 7,112 | 7,119 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,561 | 12.25 | 575 S |
| 8.625 | 1,562 | 12.25 | 575 S |
| 2.875 | 7,393 | 7.875 | 885 S |
| 2.875 | 7,394 | 7.875 | 885 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 3, 1986 | Jan 15, 1986 | Yes |
| 00 | May 17, 1984 | Mar 22, 1984 | — |
| 00 | Apr 28, 1984 | Mar 22, 1984 | — |
| 00 | Jan 12, 1984 | Jul 17, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-30917 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-30917 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04730917, documented in the API reference.