TEXAS · WELLS · BROOKS COUNTY · API 42-047-31367 · DISTRICT 04

McGill Bros. #512

Shut in

Brooks County · Kelsey (Frio Consol.) field · Producing  · Vertical

Mcgill Bros. #512 (API 42-047-31367) is a well in Brooks County operated by Hilcorp Energy Company, completed November 3, 2007 and listed as producing on the RRC schedule, shut in August 1, 2020.

The RRC has issued 5 drilling permits between 1984 and 1989, permitted to 7,500 ft.

It was permitted by Exxon Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsOverton Park Oil & Gas LPthrough Jul 2020
Latest permitExxon Corp.Oct 26, 1989
7,500
total depth, ft
5
permits on file
Oct 26, 1989
last permit issued
Nov 3, 2007
completed
0
cumulative oil, bbl
808K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 3, 2007
Shut in
Aug 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McGill Bros. G-4-137118Kelsey (Frio Consol.)Overton Park Oil & Gas LP10808KJan 1993 – Jul 2026
— G-4-112130——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Feb 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Sep 2018
  3. 3Overton Park Oil & Gas LPOct 2018 → Jul 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
365610-99RecompletionExxon Corp.Oct 25, 1989Oct 26, 1989—7,500
338303-99RecompletionExxon Corp.Nov 3, 1987Nov 5, 1987—7,500
320400-99RecompletionExxon Corp.Sep 11, 1986Sep 12, 1986—7,500
282271-99RecompletionExxon Corp.Aug 8, 1985Aug 13, 1985—7,500
241309-99DrillExxon Corp.Jun 6, 1984Jun 6, 1984Jun 14, 19847,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 3, 2007McGill Bros. G-4-137118Kelsey (Frio Consol.)Hilcorp Energy CompanyProducing · shut in Aug 1, 20207,500
Jul 5, 1989McGill Bros. G-4-112130Kelsey Deep (Zone 25-II)Exxon Corp.Not on Schedule—
Jul 5, 1989McGill Bros. G-4-112130Kelsey Deep (Zone 25-II)Exxon Corp.Not on Schedule—
Jul 5, 1989McGill Bros. G-4-112130Kelsey Deep (Zone 25-II)Exxon Corp.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
5,5725,582Perforated
6,2076,221Perforated
6,9116,916Perforated
7,0897,100Perforated
7,1127,125Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,51412.25570 S
9.6251,51512.25570 S
2.8757,4957.8751,260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 27, 2008Dec 6, 2007—
00Apr 10, 1991Nov 1, 1990Yes
00Mar 7, 1991——
00Sep 28, 1989Jul 24, 1989Yes
00Nov 7, 1986Sep 17, 1986—
00Sep 7, 1984Aug 22, 1984—
00Sep 1, 1984Aug 22, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04731367, documented in the API reference.