WELL · 42-047-31966 · DISTRICT 4
Santa FE Ranch #14
Brooks County · Tom East (13 800) field · Vertical
Santa FE Ranch #14 (API 42-047-31966) is a plugged well in Brooks County, plugged December 10, 2016, last operated by Trinity River Energy Oper LLC.
The RRC has issued one drilling permit, issued November 15, 2001, permitted to 19,000 ft.
It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Trinity River Energy Oper LLC on the wellbore schedule.
Operator of record
Permitted by EL Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 20, 2019
- Permits on file
- 6
- Phone
- (281) 389-0395
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trinity River Energy Oper LLC |
| Production reports | Smith Production Inc.through May 2009 |
| Latest permit | EL Paso Production Oil & Gas Co.Nov 15, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 19,000
- total depth, ft
- 1
- permits on file
- Nov 15, 2001
- last permit issued
- Feb 10, 2002
- completed
- 0
- cumulative oil, bbl
- 8.86M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2002 THROUGH Dec 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 10, 2002
- Shut in
- —
- Plugged
- Dec 10, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch G-4-188336 | Tom East (13,800) | Trinity River Energy Oper, LLC | 1 | 0 | 8.86M | Feb 2002 – Dec 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production Oil & Gas Co.Feb 2002 → Jul 2006
- 2EL Paso E & P Company, L. P.Aug 2006 → Feb 2008
- 3Smith Production Inc.Mar 2008 → May 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 515378-99 | Drill | EL Paso Production Oil & Gas Co. | Nov 15, 2001 | Nov 15, 2001 | Dec 20, 2001 | 19,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-188336 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,738 | 13,776 | Perforated |
| 13,792 | 13,846 | Perforated |
| 13,864 | 13,914 | Perforated |
| 13,930 | 13,964 | Perforated |
| 13,980 | 14,024 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,190 | 17.5 | 1,695 S |
| 9.625 | 10,565 | 12.25 | 885 S |
| 5 | 14,350 | 8.5 | 1,330 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 17, 2002 | Apr 22, 2002 | Yes |
| 00 | May 3, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-31966 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-31966 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04731966, documented in the API reference.