WELL · 42-047-31979 · DISTRICT 4
Santa FE Ranch #110
Brooks County · Tom East (13 800) field · Vertical
Santa FE Ranch #110 (API 42-047-31979) is a plugged well in Brooks County, plugged January 11, 2023, last operated by Hughes Dan A. Company L.P..
The RRC has issued 2 drilling permits (amended once) between 2002 and 2011, permitted to 16,500 ft.
It was permitted by Exxon Mobil Corporation and has since transferred to Hughes Dan A. Company L.P. on the wellbore schedule.
Operator of record
Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.
- Based in
- Beeville, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 25, 2026
- Permits on file
- 207
- Phone
- (361) 358-3752
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hughes, Dan A. Company, L.P.through Oct 2022 |
| Latest permit | Exxon Mobil CorporationJun 13, 2011 |
- 16,500
- total depth, ft
- 3
- permits on file
- Jun 13, 2011
- last permit issued
- Jun 25, 2002
- completed
- 0
- cumulative oil, bbl
- 3.43M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2002 THROUGH Jan 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 25, 2002
- Shut in
- —
- Plugged
- Jan 11, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch G-4-190028 | Tom East (13,800) | Hughes, Dan A. Company, L.P. | 1 | 0 | 3.43M | Jun 2002 – Jan 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Mobil CorporationJun 2002 → Jul 2010
- 2Hughes, Dan A. Company, L.P.Oct 2022 → Oct 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 718049-99 | Recompletion | Exxon Mobil Corporation | Jun 8, 2011 | Jun 13, 2011 | — | 16,500 |
| 517018-98 | Drill | Exxon Mobil Corporation | Feb 8, 2002 | Jan 23, 2002 | Mar 4, 2002 | 16,500 |
| 517018-99 | Drill | Exxon Mobil Corporation | Jan 23, 2002 | Jan 23, 2002 | — | 16,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 25, 2002 | Santa FE Ranch G-4-190028 | Tom East (13 800) | Hughes Dan A. Company L.P. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,519 | 14,537 | Perforated |
| 14,681 | 14,687 | Perforated |
| 14,748 | 14,758 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,333 | 17.5 | 1,440 S |
| 9.625 | 9,653 | 12.25 | 1,492 S |
| 5 | 13,164 | 6.5 | 540 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 17, 2002 | Aug 15, 2002 | Yes |
| 00 | Aug 23, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-31979 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-31979 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04731979, documented in the API reference.