TEXAS · WELLS · BROOKS COUNTY · API 42-047-31985 · DISTRICT 04

Santa FE Ranch #20

Y

Brooks County · Tom East (13 800) field · SWR-10-Well  · Vertical

Santa FE Ranch #20 (API 42-047-31985) is a well in Brooks County operated by Wagner Oil Company, completed June 23, 2002 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued March 12, 2002, permitted to 16,025 ft.

It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report 2 formation tops, including 13800 Sd, Jackson.

No lease production has been reported under this well’s leases.

Operator of record

Wagner Oil Company

Permitted by El Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsWagner Oil Companythrough Apr 2026
Latest permitEl Paso Production Oil & Gas Co.Mar 12, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,025
total depth, ft
1
permits on file
Mar 12, 2002
last permit issued
Jun 23, 2002
completed
0
cumulative oil, bbl
4.34M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 23, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Santa FE Ranch G-4-190121Tom East (14,900)Wagner Oil Company103.76MJun 2002 – Jul 2026
Santa FE Ranch G-4-190284Tom East (13,800)Wagner Oil Company10578KJun 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 36,327 · prior 12 39,251(-7%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1El Paso Production Oil & Gas Co.Jun 2002 → Jul 2006
  2. 2El Paso E & P Company, L. P.Aug 2006 → Feb 2008
  3. 3Smith Production Inc.Mar 2008 → Mar 2011
  4. 4Legend Natural Gas IV, LPApr 2011 → Feb 2015
  5. 5Trinity River Energy Oper, LLCMar 2015 → Mar 2018
  6. 6Wagner Oil CompanyApr 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
518248-99DrillEl Paso Production Oil & Gas Co.Mar 12, 2002Mar 12, 2002Mar 30, 200219,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 23, 2002Santa FE Ranch G-4-190284Tom East (13 800)Wagner Oil CompanySWR-10-Well · shut in Jun 1, 200216,025
Jun 2, 2002Santa FE Ranch G-4-190121Tom East (14 900)Wagner Oil CompanyProducing16,025

Formation tops

As filed on W-2/G-1. Subsea from 65 ft elevation.Download CSV →

FormationMD ftSubsea
13800 SD13,870-13,805
Jackson13,870-13,805
Jackson15,920-15,855
13800 SD——

Perforations

Perforated and open-hole intervals.

FromToType
13,77813,843Perforated
13,86113,950Perforated
14,85614,866Perforated
14,89114,901Perforated
14,90814,916Perforated
14,95515,004Perforated
15,01615,046Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,24217.51,700 S
9.62510,76612.251,035 S
516,0166.5490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 2002Aug 28, 2002—
00Sep 24, 2002Jul 17, 2002Yes
00Sep 6, 2002——
00Aug 29, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04731985, documented in the API reference.