TEXAS · WELLS · BROOKS COUNTY · SANTA FE RANCH LEASE · API 42-047-31997 · DISTRICT 04

Santa FE Ranch #120

Shut in

Brooks County · Tom East (13 800) field · Producing  · Vertical

Santa FE Ranch #120 (API 42-047-31997) is a well in Brooks County operated by Hughes Dan A. Company L.P., completed October 15, 2002 and listed as producing on the RRC schedule, shut in July 1, 2017.

The RRC has issued one drilling permit (amended once), issued May 15, 2002, permitted to 14,460 ft.

It was permitted by Exxon Mobil Corporation and has since transferred to Hughes Dan A. Company L.P. on the wellbore schedule.

Completion filings report one formation top, including Tom East (13,800).

No lease production has been reported under this well’s leases.

Operator of record

Hughes Dan A. Company L.P.

Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.

Based in
Beeville, TX
P-5 status
Active (A)
P-5 last filed
Mar 25, 2026
Permits on file
207
Phone
(361) 358-3752

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHughes Dan A. Company L.P.
Production reportsHughes, Dan A. Company, L.P.through Jun 2017
Latest permitExxon Mobil CorporationMay 15, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,460
total depth, ft
2
permits on file
May 15, 2002
last permit issued
Oct 15, 2002
completed
0
cumulative oil, bbl
13.2M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 15, 2002
Shut in
Jul 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Santa FE Ranch G-4-192325Tom East (13,800)Hughes, Dan A. Company, L.P.1013.2MOct 2002 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Mobil CorporationOct 2002 → Jan 2015
  2. 2Hughes, Dan A. Company, L.P.Feb 2015 → Jun 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
520003-98DrillExxon Mobil CorporationOct 29, 2002May 15, 2002May 30, 200216,500
520003-99DrillExxon Mobil CorporationMay 15, 2002May 15, 2002—16,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 15, 2002Santa FE Ranch G-4-192325Tom East (13 800)Hughes Dan A. Company L.P.Producing · shut in Jul 1, 201714,460

Formation tops

As filed on W-2/G-1. Subsea from 65 ft elevation.Download CSV →

FormationMD ftSubsea
Tom East (13,800)13,870-13,805
Tom East (13,800)14,324-14,259

Perforations

Perforated and open-hole intervals.

FromToType
13,90614,090Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,30017.51,415 S
9.6259,17912.252,222 S
7.62510,7538.5140 S
3.514,4456.5292 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2003Dec 20, 2002Yes
00Jan 24, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04731997, documented in the API reference.