TEXAS · WELLS · BROOKS COUNTY · API 42-047-32006 · DISTRICT 04
Santa FE Ranch #116
Brooks County · Tom East (N-68) field · Temp Abandoned · Directional
Santa FE Ranch #116 (API 42-047-32006) is a well in Brooks County operated by Hughes Dan A. Company L.P., completed May 3, 2012 and listed as temp abandoned on the RRC schedule, shut in June 1, 2017.
The RRC has issued 2 drilling permits between 2002 and 2011, permitted to 14,639 ft.
It was permitted by Exxon Mobil Corporation and has since transferred to Hughes Dan A. Company L.P. on the wellbore schedule.
Completion filings report 5 formation tops, including 12,450 Samd, 12450 Sand, 13,400 Sand, 13,800 Sand.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.
- Based in
- Beeville, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 25, 2026
- Permits on file
- 207
- Phone
- (361) 358-3752
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hughes Dan A. Company L.P. |
| Production reports | Hughes, Dan A. Company, L.P.through May 2017 |
| Latest permit | Exxon Mobil CorporationAug 29, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,639
- total depth, ft
- 2
- permits on file
- Aug 29, 2011
- last permit issued
- May 3, 2012
- completed
- 0
- cumulative oil, bbl
- 3.38M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 3, 2012
- Shut in
- Jun 1, 2017
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch G-4-192836 | Tom East (13,800) | Hughes, Dan A. Company, L.P. | 1 | 0 | 3.35M | Nov 2002 – Jul 2026 |
| Santa FE Ranch G-4-268614 | Wildcat | Hughes, Dan A. Company, L.P. | 1 | 0 | 28.7K | Apr 2005 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Mobil CorporationNov 2002 → Aug 2008
- 2Hughes, Dan A. Company, L.P.Apr 2015 → May 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 723053-99 | Recompletion | Exxon Mobil Corporation | Aug 25, 2011 | Aug 29, 2011 | Apr 10, 2012 | 16,500 |
| 521473-99 | Drill | Exxon Mobil Corporation | Jun 28, 2002 | Jul 1, 2002 | Jul 23, 2002 | 16,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 3, 2012 | Santa FE Ranch G-4-268614 | Tom East (N-68) | Hughes Dan A. Company L.P. | Temp Abandoned · shut in Jun 1, 2017 | 14,639 |
| Nov 5, 2002 | Santa FE Ranch G-4-192836 | Tom East (13 800) | Hughes Dan A. Company L.P. | Partial Plug · shut in Sep 1, 2008 | 14,639 |
Formation tops
As filed on W-2/G-1. Subsea from 89 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 12,450 Samd | 12,619 | -12,530 |
| 12450 Sand | 12,686 | -12,597 |
| 13,400 Sand | 13,303 | -13,214 |
| 13,400 Sand | 13,370 | -13,281 |
| 13,800 Sand | 14,070 | -13,981 |
| 13,800 Sand | 14,138 | -14,049 |
| 12,450 Sand | — | — |
| 13,400 Sand | — | — |
| 13,800 Sand | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,369 | 13,375 | Perforated |
| 13,381 | 13,393 | Perforated |
| 14,210 | 14,220 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,300 | 17.5 | 1,385 S |
| 9.625 | 9,283 | 12.25 | 1,296 S |
| 7.625 | 10,890 | 8.5 | 137 S |
| 3.5 | 14,649 | 6.5 | 2,275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 8, 2016 | Dec 31, 2015 | — |
| 00 | Jul 11, 2013 | Jul 26, 2012 | — |
| 00 | Mar 19, 2003 | Jan 27, 2003 | Yes |
| 00 | Feb 13, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-32006 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-32006 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04732006, documented in the API reference.