TEXAS · WELLS · BROOKS COUNTY · SANTA FE RANCH "A" LEASE · API 42-047-32010 · DISTRICT 04

Santa FE Ranch A #1

Plugged

Brooks County · Evelyn East (14 700) field  · Directional · Sidetrack

Santa FE Ranch A #1 (API 42-047-32010) is a plugged well in Brooks County, plugged December 5, 2008, last operated by Smith Production Inc..

The RRC has issued one drilling permit (amended once), issued July 15, 2002, permitted to 20,000 ft.

It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Smith Production Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including 14700, 14700 Sd.

Operator of record

Smith Production Inc.

Permitted by El Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Active (A)
P-5 last filed
Nov 12, 2025
Permits on file
433
Phone
(281) 296-5600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsEl Paso E & P Company, L. P.through Nov 2006
Latest permitEl Paso Production Oil & Gas Co.Jul 15, 2002
20,000
total depth, ft
2
permits on file
Jul 15, 2002
last permit issued
Jan 27, 2003
completed
0
cumulative oil, bbl
1.38M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Dec 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 27, 2003
Shut in
—
Plugged
Dec 5, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Santa FE Ranch "A" G-4-193308Evelyn East (14,700)Smith Production Inc.101.38MOct 2002 – Dec 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1El Paso Production Oil & Gas Co.Oct 2002 → Mar 2006
  2. 2El Paso E & P Company, L. P.Sep 2006 → Nov 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
521834-98Drill · sidetrackEl Paso Production Oil & Gas Co.Sep 4, 2002Jul 15, 2002Jul 20, 200220,000
521834-99DrillEl Paso Production Oil & Gas Co.Jul 15, 2002Jul 15, 2002—20,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 27, 2003Santa FE Ranch A G-4-193308Evelyn East (14 700)Smith Production Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 51 ft elevation.Download CSV →

FormationMD ftSubsea
1470014,723-14,672
14700 SD14,723-14,672

Perforations

Perforated and open-hole intervals.

FromToType
14,72314,754Perforated
15,04915,062Perforated
15,05315,059Perforated
15,09015,122Perforated
15,09215,096Perforated
15,10015,102Perforated
15,10615,109Perforated
15,13315,166Perforated
15,15015,155Perforated
15,16015,164Perforated
15,48815,499Perforated
15,49015,497Perforated
15,56915,595Perforated
16,13616,169Perforated
16,17916,196Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,39717.51,950 S
9.62511,90012.25990 S
516,8686.25450 S
516,8686.5450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 21, 2003Apr 7, 2003—
00May 19, 2003Dec 16, 2002—
00May 16, 2003Dec 16, 2002—
00May 15, 2003Dec 16, 2002—
00May 14, 2003Dec 16, 2002Yes
00Mar 14, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04732010, documented in the API reference.