TEXAS · WELLS · BROOKS COUNTY · SANTA FE RANCH LEASE · API 42-047-32035 · DISTRICT 04
Santa FE Ranch #25
Brooks County · Evelyn East (14 700) field · Vertical
Santa FE Ranch #25 (API 42-047-32035) is a plugged well in Brooks County, plugged September 1, 2026, last operated by Wagner Oil Company.
The RRC has issued one drilling permit, issued December 18, 2002, permitted to 17,700 ft.
It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Wagner Oil Company on the wellbore schedule.
Completion filings report 2 formation tops, including Frio, Vicksburg.
Operator of record
Permitted by El Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 23, 2025
- Permits on file
- 278
- Phone
- (817) 335-2222
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wagner Oil Company |
| Production reports | Wagner Oil Companythrough Mar 2026 |
| Latest permit | El Paso Production Oil & Gas Co.Dec 18, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 17,700
- total depth, ft
- 1
- permits on file
- Dec 18, 2002
- last permit issued
- Mar 14, 2003
- completed
- 0
- cumulative oil, bbl
- 1.58M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 14, 2003
- Shut in
- —
- Plugged
- Sep 1, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Santa FE Ranch G-4-196020 | Evelyn East (14,700) | Wagner Oil Company | 1 | 0 | 1.58M | Mar 2003 – Jul 2026 |
Gas, mcf lease total
Last 12 months 505 · prior 12 767(-34%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1El Paso Production Oil & Gas Co.Mar 2003 → Jul 2006
- 2El Paso E & P Company, L. P.Aug 2006 → Feb 2008
- 3Smith Production Inc.Mar 2008 → Mar 2011
- 4Legend Natural Gas IV, LPApr 2011 → Feb 2015
- 5Trinity River Energy Oper, LLCMar 2015 → Mar 2018
- 6Wagner Oil CompanyApr 2018 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 526486-99 | Drill | El Paso Production Oil & Gas Co. | Dec 17, 2002 | Dec 18, 2002 | Dec 23, 2002 | 17,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 14, 2003 | Santa FE Ranch G-4-196020 | Evelyn East (14 700) | Wagner Oil Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 58 ft elevation.Download CSV →
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,367 | 17.5 | 2,870 S |
| 9.875 | 11,650 | 12.25 | 591 S |
| 5 | 16,300 | 6.5 | 735 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 21, 2003 | May 9, 2003 | Yes |
| 00 | Aug 14, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-047-32035 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-047-32035 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04732035, documented in the API reference.