TEXAS · WELLS · BROOKS COUNTY · API 42-047-32037 · DISTRICT 04

Santa FE Ranch #23

Y

Brooks County · Tom East (14 900) field · SWR-10-Well  · Vertical

Santa FE Ranch #23 (API 42-047-32037) is a well in Brooks County operated by Wagner Oil Company, completed April 2, 2003 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued January 8, 2003, permitted to 15,935 ft.

It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report 2 formation tops, including 14100 Sd, 14900 Sd.

No lease production has been reported under this well’s leases.

Operator of record

Wagner Oil Company

Permitted by El Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsWagner Oil Companythrough Apr 2026
Latest permitEl Paso Production Oil & Gas Co.Jan 8, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,935
total depth, ft
1
permits on file
Jan 8, 2003
last permit issued
Apr 2, 2003
completed
0
cumulative oil, bbl
2.23M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 2, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Santa FE Ranch G-4-195169Tom East (14,100)Wagner Oil Company102.23MApr 2003 – Jul 2026
Santa FE Ranch G-4-195170Tom East (14,900)Wagner Oil Company100Apr 2003 – Jul 2026

Gas, mcf lease total

Last 12 months 44,488 · prior 12 45,487(-2%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1El Paso Production Oil & Gas Co.Apr 2003 → Jul 2006
  2. 2El Paso E & P Company, L. P.Aug 2006 → Feb 2008
  3. 3Smith Production Inc.Mar 2008 → Mar 2011
  4. 4Legend Natural Gas IV, LPApr 2011 → Feb 2015
  5. 5Trinity River Energy Oper, LLCMar 2015 → Mar 2018
  6. 6Wagner Oil CompanyApr 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
527036-99DrillEl Paso Production Oil & Gas Co.Jan 8, 2003Jan 8, 2003Feb 1, 200316,970

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 2, 2003Santa FE Ranch G-4-195170Tom East (14 900)Wagner Oil CompanySWR-10-Well · shut in Apr 1, 200315,935
Apr 2, 2003Santa FE Ranch G-4-195169Tom East (14 100)Wagner Oil CompanyProducing15,935

Formation tops

As filed on W-2/G-1. Subsea from 62 ft elevation.Download CSV →

FormationMD ftSubsea
14100 SD14,111-14,049
14900 SD14,875-14,813

Perforations

Perforated and open-hole intervals.

FromToType
14,12114,906Perforated
14,14014,932Perforated
14,16414,958Perforated
14,87514,906Perforated
14,91814,932Perforated
14,95114,958Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,34517.52,155 S
9.87510,75012.251,125 S
515,9356.5455 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 11, 2003May 19, 2003Yes
00Jul 2, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04732037, documented in the API reference.