WELL · 42-049-31937 · DISTRICT 7
Steel EG #3
Brown County · Blind Hog (Ranger) field · Vertical
Steel EG #3 (API 42-049-31937) is a plugged well in Brown County, plugged October 28, 1997, last operated by Sundance Resources Inc..
The RRC has issued 2 drilling permits between 1978 and 1981, permitted to 3,500 ft.
It was permitted by Ensource Inc. and has since transferred to Sundance Resources Inc. on the wellbore schedule.
Operator of record
Permitted by Ensource Inc.; the EWA schedule now lists a different operator.
- Based in
- Rio Vista, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 26, 2012
- Permits on file
- 100
- Phone
- (817) 373-3360
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Ensource Inc.Nov 17, 1981 |
- 3,500
- total depth, ft
- 2
- permits on file
- Nov 17, 1981
- last permit issued
- Aug 24, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 24, 1983
- Shut in
- —
- Plugged
- Oct 28, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Steel "EG" O-8-15234 | Blind Hog (Ranger) | Sundance Resources, Inc. | 1 | 0 | 0 | Jan 1993 – Dec 1997 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 140780-99 | Recompletion | Ensource Inc. | Nov 17, 1981 | Nov 17, 1981 | — | 3,074 |
| 39465-99 | Drill | Palo Petroleum, Inc. | Dec 22, 1978 | Dec 22, 1978 | Jan 30, 1979 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 24, 1983 | Steel EG O-8-15234 | Blind Hog (Ranger) | Sundance Resources Inc. | Plugged | — |
| Mar 15, 1979 | Steel G O-8-15054 | Blind Hog (Ranger) | Palo Petroleum Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,921 | 2,951 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 100 | 11 | 75 S |
| 2.375 | 2,877 | — | — |
| 2.375 | 2,901 | — | — |
| 4.5 | 3,315 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 6, 1983 | — |
| 00 | Jan 12, 1984 | Apr 30, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-049-31937 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-049-31937 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 835
- bbl, last 12 reported months
- 110K
- bbl, all reported
- Apr 1997
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000048823 | H-1 Injection | Plugged Nov 24, 1997 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 835 · prior 12 2,895(-71%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04931937, documented in the API reference.