WELL · 42-049-33462 · DISTRICT 7

McClatchey #2

Plugged

Brown County · Richmond (Canyon) field  · Vertical

Mcclatchey #2 (API 42-049-33462) is a plugged well in Brown County, plugged November 7, 2008, last operated by Northcutt Production.

The RRC has issued 2 drilling permits between 1983 and 1986, permitted to 1,400 ft.

It was permitted by Mac Exploration & Drilling Corp. and has since transferred to Northcutt Production on the wellbore schedule.

Completion filings report 2 formation tops, including Canyon, Caddo.

Its 2 leases have reported 614 barrels of oil and 4.76K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Northcutt Production

Permitted by Mac Exploration & Drilling Corp.; the EWA schedule now lists a different operator.

Bangs, TX · P-5 Y, filed Dec 5, 2008

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorthcutt Production
Production reportsNorthcutt Productionthrough Dec 2001
Latest permitMac Exploration & Drilling Corp.Apr 8, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,400
total depth, ft
2
permits on file
Apr 8, 1986
last permit issued
Mar 28, 1983
completed
614
cumulative oil, bbl
4.76K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 28, 1983
Shut in
—
Plugged
Nov 7, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McClatchey O-8-21038Medc (Caddo)Northcutt Production561456Jan 1993 – Jul 2026
McClatchey G-8-110695Richmond (Canyon)Northcutt Production104.71KJan 1993 – Nov 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Northcutt ProductionJul 1993 → Dec 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
300746-99RecompletionMac Exploration & Drilling Corp.Mar 24, 1986Apr 8, 1986—1,300
188351-99DrillMac Exploration & Drilling Corp.May 15, 1984Mar 14, 1983—1,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-110695————
—— O-8-21038————

Formation tops

As filed on W-2/G-1. Subsea from 1,522 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon3901,132
Caddo1,165357

Perforations

Perforated and open-hole intervals.

FromToType
393398Perforated
1,1681,181Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,3006.25200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 18, 1993Jul 12, 1993—
00Aug 14, 1986Apr 10, 1985—
00Aug 8, 1986——
00Jun 6, 1984May 8, 1984—
00Jun 5, 1984May 8, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

240
bbl, last 12 reported months
58.8K
bbl, all reported
Mar 2001
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052479H-1 InjectionPlugged Jan 2, 200960501,168–1,181

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 240 · prior 12 4,665(-95%)

020040060020002001

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04933462, documented in the API reference.