WELL · 42-051-30110 · DISTRICT 3
Moore Jessie #2
Burleson County · Clay N E. (Deep) field · Vertical
Moore Jessie #2 (API 42-051-30110) is a plugged well in Burleson County, plugged July 27, 1994, last operated by Seneca Resources Corporation.
The RRC has issued 2 drilling permits between 1980 and 1992, permitted to 14,810 ft.
Completion filings report 2 formation tops, including Wilcox, Chalk.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 12, 2015
- Permits on file
- 125
- Phone
- (713) 654-2600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seneca Resources Corporation |
| Production reports | Seneca Resources Corporationthrough May 1994 |
| Latest permit | Seneca Resources Corp.Feb 20, 1992 |
- 14,810
- total depth, ft
- 2
- permits on file
- Feb 20, 1992
- last permit issued
- Mar 30, 1980
- completed
- 0
- cumulative oil, bbl
- 30.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 30, 1980
- Shut in
- —
- Plugged
- Jul 27, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Moore, Jesse G-3-141554 | Clay, N.E. (Austin Chalk, Gas) | Seneca Resources Corporation | 1 | 0 | 30.4K | Jan 1993 – Jul 1994 |
| — G-3-87678 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seneca Resources CorporationJan 1993 → May 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 396698-99 | Recompletion | Seneca Resources Corp. | Feb 14, 1992 | Feb 20, 1992 | Apr 13, 1992 | 14,810 |
| 69645-99 | Recompletion | Daleco Resources | Nov 22, 1985 | Jan 15, 1980 | — | 12,110 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-87678 | — | — | — | — |
| — | — G-3-141554 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 239 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 3,600 | -3,361 |
| Chalk | 10,250 | -10,011 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,590 | 11,630 | Perforated |
| 11,890 | 12,028 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 50 | — | — |
| 10.75 | 2,550 | 14.75 | 1,086 S |
| 13.375 | 3,004 | 17.5 | 248 S |
| 2.875 | 10,400 | — | — |
| 5.5 | 11,115 | 9.875 | 350 S |
| 9.625 | 11,620 | 12.25 | 445 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 15, 1992 | Jun 9, 1992 | Yes |
| 00 | Jul 7, 1992 | — | — |
| 00 | Jan 12, 1984 | Apr 18, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-30110 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-30110 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.