WELL · 42-051-30623 · DISTRICT 3
Seay R. E. et AL #2
Burleson County · Inez Jameson (Navarro) field · Vertical
Seay R. E. ET AL #2 (API 42-051-30623) is a well in Burleson County operated by General Prod. Corp., completed April 10, 1980.
The RRC has issued one drilling permit, issued February 13, 1980, permitted to 3,700 ft.
Its lease has reported 41.8K barrels of oil and 127K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Brenham, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 8, 1982
- Permits on file
- 100
- Phone
- (409) 836-1340
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | General Prod. Corp. |
| Production reports | Rusk Energy Operating LLCthrough Apr 2026 |
| Latest permit | General Prod. Corp.Feb 13, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- Feb 13, 1980
- last permit issued
- Apr 10, 1980
- completed
- 41.8K
- cumulative oil, bbl
- 127K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 1980
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Seay, R.E. et AL O-3-14132 | Inez Jameson (Navarro -A-) | Rusk Energy Operating LLC | 3 | 41.8K | 127K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 498 · prior 12 396(+26%)
Gas, mcf lease total
Last 12 months 1,206 · prior 12 2,987(-60%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Austin Ridge Energy CorporationJan 1993 → May 1998
- 2Shoreham Oil & Gas Company, Inc.Jun 1998 → Mar 2007
- 3Viceroy Petroleum GP, LLCNov 2007 → Feb 2010
- 4Viceroy Petroleum, LPMar 2010 → Dec 2024
- 5Rusk Energy Operating LLCMar 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 72628-99 | Drill | General Prod. Corp. | Feb 13, 1980 | Feb 13, 1980 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-14132 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,061 | 3,117 | Perforated |
| — | 3,117 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 120 | 12 | 80 S |
| 2.375 | 2,297 | — | — |
| 4.5 | 3,344 | 7 | 775 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Apr 28, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-30623 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-30623 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05130623, documented in the API reference.