TEXAS · WELLS · BURLESON COUNTY · ARLEDGE "A" LEASE · API 42-051-30827 · DISTRICT 03
Arledge A #1
Burleson County · Willard (Navarro) field · Vertical
Arledge A #1 (API 42-051-30827) is a plugged well in Burleson County, plugged April 16, 2024, last operated by Ernest Operating Company.
The RRC has issued one drilling permit, issued June 23, 1980, permitted to 3,700 ft.
It was permitted by Hollub, Lambert Drilling Company and has since transferred to Ernest Operating Company on the wellbore schedule.
Its lease has reported 6.9K barrels of oil and 14.2K mcf of gas since January 1993, last reporting in April 2025.
Operator of record
Permitted by Hollub, Lambert Drilling Company; the EWA schedule now lists a different operator.
- Based in
- Rockdale, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Feb 24, 2026
- Permits on file
- 32
- Phone
- (512) 446-3855
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ernest Operating Company |
| Production reports | Ernest Operating Companythrough Jun 2021 |
| Latest permit | Hollub, Lambert Drilling CompanyJun 23, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- Jun 23, 1980
- last permit issued
- Aug 3, 1980
- completed
- 6.9K
- cumulative oil, bbl
- 14.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 1980
- Shut in
- —
- Plugged
- Apr 16, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arledge "A" O-3-13253 | Willard (Navarro) | Ernest Operating Company | 1 | 6.9K | 14.2K | Jan 1993 – Apr 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1H&K Oil Field Services, Inc.Jan 1993 → Feb 1994
- 2Keesee, H. K.Mar 1994 → Apr 1994
- 3Ernest Operating CompanyMay 1994 → Jun 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 84671-99 | Drill | Hollub, Lambert Drilling Company | Jun 23, 1980 | Jun 23, 1980 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 3, 1980 | Arledge A O-3-13253 | Willard (Navarro) | Ernest Operating Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,488 | 3,515 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 153 | 12.25 | 110 S |
| 2.375 | 3,400 | — | — |
| 4.5 | 3,740 | 7.875 | 715 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 21, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-30827 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-30827 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05130827, documented in the API reference.