TEXAS · WELLS · BURLESON COUNTY · VERWOLD, EDWARD LEASE · API 42-051-31974 · DISTRICT 03

Verwold Edward #1

Plugged

Burleson County · Caldwell (Austin Chalk) field  · Vertical

Verwold Edward #1 (API 42-051-31974) is a plugged well in Burleson County, plugged April 6, 2004, last operated by Apache Corporation.

The RRC has issued 2 drilling permits between 1981 and 1989, permitted to 7,900 ft.

It was permitted by Amoco Production Company and has since transferred to Apache Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Buda, Georgetown.

Its lease has reported 17.5K barrels of oil and 56.3K mcf of gas since January 1993, last reporting in June 2004.

Operator of record

Apache Corporation

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,757
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Mar 2004
Latest permitAmoco Production CompanyMar 28, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,900
total depth, ft
2
permits on file
Mar 28, 1989
last permit issued
Aug 21, 1989
completed
17.5K
cumulative oil, bbl
56.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 21, 1989
Shut in
—
Plugged
Apr 6, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Verwold, Edward O-3-15209Caldwell (Austin Chalk)Apache Corporation117.5K56.3KJan 1993 – Jun 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1MW Petroleum CorporationJan 1993 → Aug 1998
  2. 2Apache CorporationSep 1998 → Mar 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
356423-99RecompletionAmoco Production CompanyFeb 27, 1989Mar 28, 1989—7,820
145760-99DrillAmoco Production Co.-AlvinDec 16, 1981Dec 16, 1981—7,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 21, 1989Verwold Edward O-3-15209Caldwell (Austin Chalk)Apache CorporationPlugged—
Aug 21, 1989Verwold Edward O-3-15209Caldwell (Austin Chalk)Apache CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 332 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk7,100-6,768
Buda7,560-7,228
Georgetown7,620-7,288

Perforations

Perforated and open-hole intervals.

FromToType
7,1287,149Perforated
7,1287,210Perforated
7,1547,182Perforated
7,1867,194Perforated
7,1987,210Perforated
7,5757,585Perforated
7,6407,650Perforated
7,6547,658Perforated
7,6647,668Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1680——
8.6251,50012.25753 S
8.6251,50512.25753 S
2.8757,000——
5.57,8127.8751,180 S
5.57,8207.875510 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 27, 1990Sep 22, 1989Yes
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05131974, documented in the API reference.