WELL · 42-051-32490 · DISTRICT 3
Y. P. L. #1
Burleson County · Clay N.E. (Georgetown) field · Vertical
Y. P. L. #1 (API 42-051-32490) is a plugged well in Burleson County, plugged July 3, 1998, last operated by Seneca Resources Corporation.
The RRC has issued 2 drilling permits between 1983 and 1995, permitted to 12,124 ft.
Completion filings report 3 formation tops, including Ausstin Chalk, Eagle Ford, Edwards.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 12, 2015
- Permits on file
- 125
- Phone
- (713) 654-2600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seneca Resources Corporation |
| Production reports | Seneca Resources Corporationthrough Apr 1998 |
| Latest permit | Seneca Resources Corp.Aug 25, 1995 |
- 12,124
- total depth, ft
- 2
- permits on file
- Aug 25, 1995
- last permit issued
- Oct 5, 1983
- completed
- 0
- cumulative oil, bbl
- 59.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 5, 1983
- Shut in
- —
- Plugged
- Jul 3, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Y. P. L. G-3-155568 | Clay, N.E. (Austin Chalk, Gas) | Moore Petroleum Service, Inc. | 1 | 0 | 44.2K | Sep 1995 – Jul 1998 |
| Y. P. L. G-3-107786 | Clay, N.E. (Georgetown) | Seneca Resources Corporation | 1 | 0 | 15.4K | Jan 1993 – Nov 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seneca Resources CorporationJan 1993 → Apr 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 439115-99 | Recompletion | Seneca Resources Corp. | Aug 18, 1995 | Aug 25, 1995 | Aug 30, 1995 | 11,680 |
| 200927-99 | Drill | Daleco Resources | Apr 17, 1985 | Jul 8, 1983 | Aug 4, 1983 | 12,124 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-107786 | — | — | — | — |
| — | — G-3-155568 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 198 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Ausstin Chalk | 11,200 | -11,002 |
| Eagle FordEAGLEFORD SHALE | 11,580 | -11,382 |
| EdwardsEDWARDS LIME | 11,905 | -11,707 |
| EdwardsEDWARDS REEF | 12,075 | -11,877 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,480 | 11,580 | Perforated |
| 11,910 | 11,980 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,918 | 12.25 | 830 S |
| 2.375 | 11,737 | — | — |
| 5.5 | 12,120 | 8.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 7, 1995 | Oct 3, 1995 | Yes |
| 00 | Oct 11, 1995 | — | — |
| 00 | Jan 12, 1984 | Oct 25, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-051-32490 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-051-32490 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.