TEXAS · WELLS · BURLESON COUNTY · STANLEY "B" LEASE · API 42-051-32636 · DISTRICT 03

Stanley B #1

Plugged

Burleson County · Hooker Creek (Navarro A) field  · Vertical

Stanley B #1 (API 42-051-32636) is a plugged well in Burleson County, plugged June 13, 2001, last operated by Ernest Operating Company.

The RRC has issued one drilling permit, issued February 14, 1984, permitted to 4,500 ft.

It was permitted by Hollub, Lambert Drilling Company and has since transferred to Ernest Operating Company on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Top Poth, Base Poth.

Its lease has reported 1.37K barrels of oil and 3.76K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Ernest Operating Company

Permitted by Hollub, Lambert Drilling Company; the EWA schedule now lists a different operator.

Based in
Rockdale, TX
P-5 status
Active – Extension (X)
P-5 last filed
Feb 24, 2026
Permits on file
32
Phone
(512) 446-3855

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleErnest Operating Company
Production reportsErnest Operating Companythrough Jun 2001
Latest permitHollub, Lambert Drilling CompanyFeb 14, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Feb 14, 1984
last permit issued
Apr 18, 1984
completed
1.37K
cumulative oil, bbl
3.76K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 18, 1984
Shut in
—
Plugged
Jun 13, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stanley "B" O-3-17757Hooker Creek (Navarro A)Ernest Operating Company11.37K3.76KJan 1993 – Jun 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crescent Exploration CompanyJan 1993 → Feb 1994
  2. 2Keesee, H. K.Mar 1994 → Apr 1994
  3. 3Ernest Operating CompanyJun 1994 → Mar 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
229553-99DrillHollub, Lambert Drilling CompanyApr 17, 1984Feb 14, 1984—4,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 18, 1984Stanley B O-3-17757Hooker Creek (Navarro A)Ernest Operating CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 396 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxBASE WILCOX3,188-2,792
Top Poth3,245-2,849
Base Poth3,453-3,057

Perforations

Perforated and open-hole intervals.

FromToType
3,9984,025Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517512.25125 sx
4.54,2357.875695 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 26, 1984Jul 12, 1984—
00Jul 24, 1984Jul 12, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05132636, documented in the API reference.