WELL · 42-051-32828 · DISTRICT 3

Easterwood #1

N

Burleson County  · Horizontal · Sidetrack

Easterwood #1 (API 42-051-32828) is a permitted horizontal well in Burleson County filed by Gemini Exploration Company; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1985 and 1994, permitted to 8,800 ft.

Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford, Buda.

Its lease has reported 399K barrels of oil and 472K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Gemini Exploration Company

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 27, 1999
Permits on file
174
Phone
(214) 526-6357

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsWildfire Energy Operating LLCthrough Mar 2026
Latest permitGemini Exploration CompanyMar 23, 1994
8,800
total depth, ft
3
permits on file
Mar 23, 1994
last permit issued
—
completed
399K
cumulative oil, bbl
472K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Easterwood O-3-18593Giddings (Austin Chalk-3)Wildfire Energy Operating LLC1399K472KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 4,063 · prior 12 7,199(-44%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 102 · prior 12 4,664(-98%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fenn, Bill Inc.Jan 1993 → Jun 1993
  2. 2Gemini Exploration CompanyJul 1993 → Apr 1995
  3. 3Union Pacific Austin Chalk Co.May 1995 → Jan 2001
  4. 4Rme Austin Chalk CompanyFeb 2001 → Nov 2002
  5. 5Anadarko Austin Chalk CompanyDec 2002 → Feb 2006
  6. 6Anadarko E&P Company LPMar 2006 → Dec 2012
  7. 7Anadarko E&P Onshore LLCJan 2013 → Jun 2017
  8. 8Wildhorse Resources Mngt Co, LLCJul 2017 → May 2019
  9. 9Chesapeake Operating, L.L.C.Jun 2019 → Feb 2023
  10. 10Wildfire Energy Operating LLCMar 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
422344-99Recompletion · sidetrackGemini Exploration CompanyMar 23, 1994Mar 23, 1994Mar 24, 19947,750
277594-99RecompletionFenn, Bill Inc.Jun 10, 1985Jun 11, 1985—8,800
269768-99DrillFenn, Bill Inc.Mar 13, 1985Mar 19, 1985—8,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-18593————

Formation tops

As filed on W-2/G-1. Subsea from 358 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap6,606-6,248
Austin Chalk7,276-6,918
Austin Chalk7,278-6,920
Eagle FordEAGLEFORD7,890-7,532
Buda8,119-7,761

Perforations

Perforated and open-hole intervals.

FromToType
7,48810,884Perforated
7,7297,888Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,85012.5—
5.58,2898.5—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 2, 1994May 4, 1994Yes
00Jul 5, 1985Jun 10, 1985—
00Jun 25, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05132828, documented in the API reference.