TEXAS · WELLS · BURLESON COUNTY · API 42-051-33175 · DISTRICT 03

Crook-Hanover Unit #1

Shut in

Burleson County · Caldwell (Austin Chalk) field · Temp Abandoned  · Horizontal

Crook-Hanover Unit #1 (API 42-051-33175) is a horizontal well in Burleson County operated by Proline Energy Resources Inc, completed March 21, 1991 and listed as temp abandoned on the RRC schedule, shut in January 1, 2025.

The RRC has issued one drilling permit, issued December 20, 1990, permitted to 8,159 ft.

It was permitted by Cox & Perkins Exploration, Inc. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.

Completion filings report 4 formation tops, including Red Beds, Coleman Junction, Austin Chalk, Top Marker.

Its 2 leases have reported 76.9K barrels of oil and 1.54M mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Proline Energy Resources Inc

Permitted by Cox & Perkins Exploration, Inc.; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Phone
(832) 886-4420

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProline Energy Resources Inc
Production reportsProline Energy Resources Incthrough Dec 2024
Latest permitCox & Perkins Exploration, Inc.Dec 20, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,159
total depth, ft
1
permits on file
Dec 20, 1990
last permit issued
Mar 21, 1991
completed
76.9K
cumulative oil, bbl
1.54M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 21, 1991
Shut in
Jan 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crook-Hanover Unit G-3-291897Caldwell (Austin Chalk)Proline Energy Resources Inc1010.9KJan 2022 – Jul 2026
Crook-Hanover Unit O-3-21084Caldwell (Austin Chalk)Proline Energy Resources Inc376.9K1.53MJan 1993 – Apr 2022

Gas, mcf lease total

Last 12 months 0 · prior 12 2,117(-100%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cox & Perkins Exploration, Inc.Jan 1993 → Jun 2012
  2. 2Llewellin Operating Company, LLCJul 2012 → Dec 2013
  3. 3Zarvona Energy LLCJan 2014 → Oct 2017
  4. 4Proline Energy Resources IncNov 2017 → Dec 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
382513-99DrillCox & Perkins Exploration, Inc.Dec 18, 1990Dec 20, 1990Feb 17, 199111,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 21, 1991Crook-Hanover Unit G-3-291897Caldwell (Austin Chalk)Proline Energy Resources IncTemp Abandoned · shut in Jan 1, 20258,159
Apr 5, 1991Crook-Hanover Unit O-3-21084Caldwell (Austin Chalk)Proline Energy Resources IncNot on Schedule—
Apr 5, 1991Crook-Hanover Unit O-3-21084Caldwell (Austin Chalk)Proline Energy Resources IncNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 295 ft elevation.Download CSV →

FormationMD ftSubsea
Red Beds27025
Coleman Junction3,007-2,712
Austin Chalk8,174-7,879
Austin Chalk8,238-7,943
Top Marker8,268-7,973

Perforations

Perforated and open-hole intervals.

FromToType
8,26810,680Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,01814.75450 S
7.6258,2689.8751,220 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 23, 2022Feb 2, 2022—
00May 20, 1993Apr 15, 1991Yes
00Jul 26, 1991Apr 15, 1991Yes
00Jul 24, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05133175, documented in the API reference.