WELL · 42-051-33357 · DISTRICT 3

Leachman-Robinson Unit #1RE

N

Burleson County  · Horizontal · Sidetrack

Leachman-Robinson Unit #1RE (API 42-051-33357) is a permitted horizontal well in Burleson County filed by Enervest Operating, L.L.C.; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1992 and 2009, permitted to 14,500 ft.

Completion filings report 6 formation tops, including Midway, Navarro, Pecan Gap, Austin Chalk.

Its 2 leases have reported 6.84K barrels of oil and 1.72M mcf of gas since February 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Enervest Operating, L.L.C.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 13, 2026
Permits on file
1,249
Phone
(713) 659-3500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsEnervest Operating, L.L.C.through Jun 2011
Latest permitEnervest Operating, L.L.C.Feb 23, 2009
14,500
total depth, ft
4
permits on file
Feb 23, 2009
last permit issued
—
completed
6.84K
cumulative oil, bbl
1.72M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Leachman-Robinson Unit O-3-24260Giddings (Austin Chalk-3)Magnolia Oil & Gas Operating LLC16.84K172KAug 2002 – Jul 2026
Leachmann-Robinson Unit G-3-145659Clay, NE (Austin Chalk 11350)Rme Petroleum Company101.55MFeb 1993 – Nov 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyFeb 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Jul 2007
  4. 4Enervest Operating, L.L.C.Aug 2007 → Nov 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
678475-99RecompletionEnervest Operating, L.L.C.Feb 11, 2009Feb 23, 2009—12,000
518597-98Recompletion · sidetrackRme Petroleum CompanySep 23, 2002Mar 27, 2002Jun 30, 200212,000
518597-99Recompletion · sidetrackRme Petroleum CompanyMar 27, 2002Mar 27, 2002—12,000
407373-99DrillUnion Pacific Resources CompanyDec 17, 1992Dec 17, 1992Dec 29, 199214,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-145659————
—— O-3-24260————

Formation tops

As filed on W-2/G-1. Subsea from 208 ft elevation.Download CSV →

FormationMD ftSubsea
Midway6,700-6,492
Navarro7,778-7,570
Pecan Gap9,910-9,702
Austin Chalk10,678-10,470
Austin Chalk10,692-10,484
Buda11,418-11,210
Georgetown11,530-11,322

Perforations

Perforated and open-hole intervals.

FromToType
10,74715,063Perforated
10,75413,711Perforated
11,23114,963Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,50014.751,650 S
7.62510,7479.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 10, 2003Sep 6, 2002Yes
00Nov 12, 2002——
00Jul 28, 1993Mar 16, 1993Yes
00Jul 6, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05133357, documented in the API reference.