TEXAS · WELLS · CALDWELL COUNTY · API 42-055-31471 · DISTRICT 01

New, Jennie W. et Al #1

Plugged

Caldwell County  · Vertical

New, Jennie W. ET AL #1 (API 42-055-31471) is a plugged well in Caldwell County, plugged June 14, 1980, last operated by Tri-County Operating Company.

The RRC has issued one drilling permit, issued June 11, 1980, permitted to 2,795 ft.

Operator of record

Tri-County Operating Company

Based in
Seguin, TX
P-5 status
Inactive (I)
P-5 last filed
Oct 10, 1991
Permits on file
37
Phone
(210) 372-0430

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTri-County Operating CompanyJun 11, 1980
2,795
total depth, ft
1
permits on file
Jun 11, 1980
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 14, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
84209-99DrillTri-County Operating CompanyJun 11, 1980Jun 11, 1980—2,795

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05531471, documented in the API reference.