TEXAS · WELLS · CALDWELL COUNTY · CARTER UNIT LEASE · API 42-055-34916 · DISTRICT 01

Carter Unit #5H

Shut in

Caldwell County · Salt Flat (Edwards) field · Shut In  · Horizontal

Carter Unit #5H (API 42-055-34916) is a horizontal well in Caldwell County operated by Texian Operating Company LLC, completed February 28, 2010 and listed as shut in on the RRC schedule, shut in November 1, 2019.

The RRC has issued one drilling permit, issued February 16, 2010, permitted to 2,682 ft.

It was permitted by North South Oil, LLC and has since transferred to Texian Operating Company LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Del Rio, Edwards.

Its lease has reported 534K barrels of oil since April 2009, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Texian Operating Company LLC

Permitted by North South Oil, LLC; the EWA schedule now lists a different operator.

Based in
Irving, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 12, 2026
Phone
(817) 633-7777

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexian Operating Company LLC
Production reportsTexian Operating Company, LLCthrough Mar 2026
Latest permitNorth South Oil, LLCFeb 16, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,682
total depth, ft
1
permits on file
Feb 16, 2010
last permit issued
Feb 28, 2010
completed
534K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 28, 2010
Shut in
Nov 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carter Unit O-1-15102Salt Flat (Edwards)Texian Operating Company, LLC9534K0Apr 2009 – Jul 2026

Oil, barrels lease total

Last 12 months 8,598 · prior 12 10,860(-21%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1North South Oil, LLCSep 2009 → May 2020
  2. 2Eagle Energy Acquisitions LPAug 2011 → Aug 2014
  3. 3Eagle Hydrocarbons (Texas) Inc.Sep 2014 → Mar 2015
  4. 4Eagle Hydrocarbons Inc.Apr 2015 → Jan 2018
  5. 5Costa Energy, LLCJun 2020 → Oct 2022
  6. 6Team Operating, L.L.C.Nov 2022 → Jul 2023
  7. 7Texian Operating Company, LLCAug 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
691244-99DrillNorth South Oil, LLCFeb 12, 2010Feb 16, 2010Feb 17, 20103,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 28, 2010Carter Unit O-1-15102Salt Flat (Edwards)Texian Operating Company LLCShut In · shut in Nov 1, 20192,682

Formation tops

As filed on W-2/G-1. Subsea from 12 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk2,236-2,224
Del RioDEL RIO CLAY2,609-2,597
EdwardsUPPER EDWARDS2,709-2,697

Perforations

Perforated and open-hole intervals.

FromToType
2,9403,047Open hole
3,0004,783Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
73,0008.75529 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 23, 2013Jan 28, 2013Yes
00Jan 14, 2013Sep 14, 2011Yes
00Aug 15, 2011May 3, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05534916, documented in the API reference.