WELL · 42-055-35034 · DISTRICT 1
CR Ranch Unit #9H
Caldwell County · Luling Branyon R 40 Exc field · Horizontal
CR Ranch Unit #9H (API 42-055-35034) is a plugged horizontal well in Caldwell County, plugged September 30, 2025, last operated by North South Oil LLC.
The RRC has issued one drilling permit (amended once), issued January 9, 2013, permitted to 3,200 ft.
Completion filings report 3 formation tops, including Austin Chalk, Buda, Edwards.
Its 2 leases have reported 451K barrels of oil since July 2012, last reporting in July 2026. The leases carry 31 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Luling, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- May 18, 2022
- Permits on file
- 172
- Phone
- (870) 871-1250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North South Oil LLC |
| Production reports | North South Oil, LLCthrough Apr 2020 |
| Latest permit | North South Oil, LLCJan 9, 2013 |
- 3,200
- total depth, ft
- 2
- permits on file
- Jan 9, 2013
- last permit issued
- May 22, 2014
- completed
- 451K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 22, 2014
- Shut in
- —
- Plugged
- Sep 30, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 31 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| C R Ranch Unit O-1-17332 | Luling-Branyon | North South Oil, LLC | 16 | 411K | 0 | Jul 2012 – Jul 2026 |
| CR Ranch Unit O-1-19333 | Luling Branyon R 40 Exc | North South Oil, LLC | 15 | 40.3K | 0 | Jun 2018 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1North South Oil, LLCSep 2012 → Apr 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 753900-98 | Drill | North South Oil, LLC | Dec 28, 2015 | Jan 9, 2013 | May 10, 2014 | 3,200 |
| 753900-99 | Drill | North South Oil, LLC | Dec 28, 2012 | Jan 9, 2013 | May 10, 2014 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-17332 | — | — | — | — |
| — | — O-1-19333 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Austin Chalk | 1,928 |
| BudaBUDA - DISPOSAL | 2,194 |
| EdwardsEDWARDS - H2S, DISPOSAL | 2,349 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,898 | 4,085 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 2,898 | 8.75 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 2018 | Jan 22, 2015 | Yes |
| 00 | Aug 18, 2015 | Jan 22, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-055-35034 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-055-35034 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05535034, documented in the API reference.