WELL · 42-057-01311 · DISTRICT 2
State Tract 26 #3
Calhoun County · Lavaca Bay (F-39) field · Vertical
State Tract 26 #3 (API 42-057-01311) is a plugged well in Calhoun County, plugged July 3, 2018, last operated by Neumin Production Company.
The RRC has issued 2 drilling permits between 1983 and 1999, permitted to 11,500 ft.
Operator of record
- Based in
- Point Comfort, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 9, 2023
- Permits on file
- 380
- Phone
- (361) 987-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Neumin Production Companythrough Jan 2018 |
| Latest permit | Neumin Production CompanySep 30, 1999 |
- 11,500
- total depth, ft
- 2
- permits on file
- Sep 30, 1999
- last permit issued
- Jul 29, 1983
- completed
- 0
- cumulative oil, bbl
- 881K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 29, 1983
- Shut in
- —
- Plugged
- Jul 3, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 26 G-2-106801 | Lavaca Bay (F-39) | Neumin Production Company | 1 | 0 | 881K | Jan 1993 – Jul 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Neumin Production CompanyJan 1993 → Jan 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 487966-99 | Recompletion | Neumin Production Company | Sep 27, 1999 | Sep 30, 1999 | — | 10,500 |
| 201904-99 | Recompletion | Neumin Production Company | Jul 19, 1983 | Jul 19, 1983 | — | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 29, 1983 | State Tract 26 G-2-106801 | Lavaca Bay (F-39) | Neumin Production Company | Plugged | — |
| Apr 1, 1966 | State Tract 26 G-2-38944 | Lavaca Bay (F-34) | Aluminum Co. of America | Plugged | — |
| Apr 1, 1966 | State Tract 26 G-2-38909 | Lavaca Bay (F-33) | Aluminum Co. of America | Plugged | — |
| — | State Tract 26 G-2-48384 | Lavaca Bay (F-43) | Neumin Production Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,556 | 9,592 | Perforated |
| 9,750 | 9,798 | Perforated |
| 10,598 | 10,624 | Perforated |
| 10,965 | — | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 76 | — | — |
| 10.75 | 1,815 | 15 | 800 S |
| 7.625 | 8,930 | 9.875 | 600 S |
| 2.375 | 10,398 | — | — |
| 5 | 11,500 | 6.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 22, 1983 | — |
| 00 | Jan 12, 1984 | Jun 8, 1970 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-01311 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-01311 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05701311, documented in the API reference.