TEXAS · WELLS · CALHOUN COUNTY · WELDER, PATRICK H. -A- LEASE · API 42-057-01409 · DISTRICT 02
Welder Patrick H. -A- #41
Calhoun County · Heyser (F-40) field · Temp Abandoned · Vertical
Welder Patrick H. -A- #41 (API 42-057-01409) is a well in Calhoun County operated by B&L Resources L.L.C., completed October 28, 1984 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.
The RRC has issued 2 drilling permits between 1981 and 1984, permitted to 5,575 ft.
It was permitted by Exxon Corp. and has since transferred to B&L Resources L.L.C. on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Metairie, LA
- P-5 status
- Active (A)
- P-5 last filed
- Jan 12, 2026
- Permits on file
- 6
- Phone
- (504) 837-4337
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | Exxon Corp.through Oct 1994 |
| Latest permit | Exxon Corp.Jun 19, 1984 |
- 5,575
- total depth, ft
- 2
- permits on file
- Jun 19, 1984
- last permit issued
- Oct 28, 1984
- completed
- 0
- cumulative oil, bbl
- 8.43K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 28, 1984
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Welder, Patrick H. -A- G-2-113506 | Heyser (F-40) | B&L Resources, L.L.C. | 1 | 0 | 8.43K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Oct 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 242460-99 | Recompletion | Exxon Corp. | Jun 14, 1984 | Jun 19, 1984 | — | 5,575 |
| 105384-99 | Other | Exxon Corp. | Jan 15, 1981 | Jan 15, 1981 | — | 5,575 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 28, 1984 | Welder Patrick H. -A- G-2-113506 | Heyser (F-40) | B&L Resources L.L.C. | Temp Abandoned · shut in Jan 1, 1998 | 5,575 |
| Nov 12, 1980 | Welder P. H. -A- O-2-4287 | Heyser (F-36) | B&L Resources L.L.C. | Not on Schedule | — |
| May 8, 1968 | Welder P. H. -A- O-2-4346 | Heyser (F-44) | Exxon Corp. | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,366 | 5,370 | Perforated |
| 5,402 | 5,408 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,560 | 12.25 | 600 S |
| — | 1,560 | 12.25 | 600 S |
| 2.875 | 5,572 | 7.875 | 310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 14, 1984 | Nov 9, 1984 | — |
| 00 | Nov 28, 1984 | Oct 29, 1984 | — |
| 00 | Jan 12, 1984 | Jan 7, 1981 | — |
| 00 | Jan 12, 1984 | May 17, 1968 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-01409 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-01409 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05701409, documented in the API reference.