TEXAS · WELLS · CALHOUN COUNTY · API 42-057-01436 · DISTRICT 02
Texas State Tract 115 #2
Calhoun County · Panther Reef SW. (Frio 8250) field · Vertical
Texas State Tract 115 #2 (API 42-057-01436) is a plugged well in Calhoun County, plugged July 30, 1991, last operated by Texaco E & P Inc..
The RRC has issued 2 drilling permits (amended once) between 1981 and 1989, permitted to 8,910 ft.
It was permitted by Texaco Producing Inc. and has since transferred to Texaco E & P Inc. on the wellbore schedule.
Operator of record
Permitted by Texaco Producing Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 22, 2003
- Permits on file
- 3,332
- Phone
- (281) 561-3713
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Texaco Producing Inc.Oct 9, 1989 |
- 8,910
- total depth, ft
- 3
- permits on file
- Oct 9, 1989
- last permit issued
- Jun 27, 1990
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 27, 1990
- Shut in
- —
- Plugged
- Jul 30, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 363804-98 | Recompletion | Texaco Producing Inc. | Jul 13, 1990 | Oct 9, 1989 | — | 8,910 |
| 363804-99 | Recompletion | Texaco Producing Inc. | Sep 11, 1989 | Oct 9, 1989 | — | 8,910 |
| 147500-99 | Recompletion | Getty Oil Co. | Dec 22, 1981 | Dec 22, 1981 | — | 8,910 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 27, 1990 | Texas State Tract 115 G-2-135418 | Panther Reef SW. (Frio 8250) | Texaco E & P Inc. | Plugged | — |
| Apr 21, 1990 | Texas State Tract 115 G-2-45501 | Panther Reef SW. (Frio G-1) | Texaco Producing Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,335 | 8,830 | Perforated |
| 7,978 | 7,985 | Perforated |
| 8,010 | 8,016 | Perforated |
| 8,496 | 8,510 | Perforated |
| 8,725 | 8,734 | Perforated |
| 8,736 | 8,743 | Perforated |
| 8,817 | 8,821 | Perforated |
| 8,829 | 8,835 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 113 | — | — |
| 10.75 | 1,200 | 15 | 725 S |
| 10.75 | 1,285 | 15 | 725 S |
| 7.625 | 7,176 | 9.875 | 200 S |
| 7.625 | 7,500 | 9.875 | 200 S |
| 16 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 11, 1991 | May 9, 1990 | — |
| 00 | Dec 20, 1990 | Jul 19, 1990 | Yes |
| 00 | Aug 31, 1990 | — | — |
| 00 | Sep 7, 1989 | Aug 24, 1989 | — |
| 00 | Jan 12, 1984 | Dec 9, 1968 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-057-01436 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-057-01436 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/05701436, documented in the API reference.