TEXAS · WELLS · CALHOUN COUNTY · API 42-057-31219 · DISTRICT 02

State Tract 177 #4D

Plugged

Calhoun County · Steamboat Pass ( 2) field  · Vertical

State Tract 177 #4D (API 42-057-31219) is a plugged well in Calhoun County, plugged June 27, 1994, last operated by Neumin Production Company.

The RRC has issued 4 drilling permits between 1982 and 1989, permitted to 5,850 ft.

Completion filings report 5 formation tops, including Miocene (undifferentiated), Top Of M. Miocene, Top Of L Miocene, Top Of L. Miocene.

Operator of record

Neumin Production Company

Based in
Point Comfort, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 9, 2023
Permits on file
380
Phone
(361) 987-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeumin Production Company
Production reportsnone
Latest permitNeumin Production CompanyAug 9, 1989
5,850
total depth, ft
4
permits on file
Aug 9, 1989
last permit issued
Jul 22, 1989
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 22, 1989
Shut in
—
Plugged
Jun 27, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State Tract 177 G-2-105754Steamboat Pass (10)Neumin Production Company100Jan 1993 – Jun 1994
State Tract 177 G-2-131858Steamboat Pass ( 2)Neumin Production Company100Jan 1993 – Jun 1994

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
362422-99RecompletionNeumin Production CompanyAug 7, 1989Aug 9, 1989—5,850
235490-99RecompletionNeumin Production CompanyApr 12, 1984Apr 12, 1984—5,850
228555-99RecompletionNeumin Production CompanyFeb 2, 1984Feb 3, 1984—5,850
178737-99DrillNeumin Production CompanyDec 2, 1982Dec 2, 1982Mar 10, 19835,850

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 22, 1989State Tract 177 G-2-131858Steamboat Pass ( 2)Neumin Production CompanyPlugged—
May 7, 1984State Tract 177 G-2-111044Steamboat Pass ( 5)Neumin Production CompanyPlugged—
Jan 4, 1984State Tracte 177 G-2-109079Steamboat Pass (2250)Neumin Production CompanyPlugged—
Apr 26, 1983State Tract 177 G-2-105754Steamboat Pass (10)Neumin Production CompanyPlugged—
Apr 26, 1983State Tract 177 G-2-105758Steamboat Pass ( 9)Neumin Production CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 25 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)TOP OF MIOCENE2,850-2,825
Top of M. Miocene2,850-2,825
Top of L Miocene3,600-3,575
Top of L. Miocene3,600-3,575
L. Miocene5,850-5,825
Miocene (undifferentiated)LOWER MIOCENE5,850-5,825
Miocene (undifferentiated)MIOCENE5,850-5,825

Perforations

Perforated and open-hole intervals.

FromToType
1,2181,228Perforated
1,6651,669Perforated
2,2762,278Perforated
2,7982,802Perforated
2,8402,844Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
16110——
10.7554514.75467 S
2.8753,0129.8751,350 S
2.8753,012——
2.8753,4139.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 10, 1989Sep 1, 1989Yes
00Oct 5, 1989——
00Jul 5, 1984Jun 6, 1984—
00Jun 30, 1984Jun 6, 1984—
00Mar 13, 1984Feb 10, 1984—
00Mar 5, 1984Feb 10, 1984—
00Jan 12, 1984May 27, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/05731219, documented in the API reference.